| Category / Work Type / Metric | Final |
Restoration Metrics (rolled up from Worksite level) |
Instream Habitat Project |
Channel reconfiguration and connectivity (C.4.c.1) |
|
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
|
0.14
|
|
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
|
0.01
|
|
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
|
0.5
|
|
Instream Pools Created/Added (C.4.c.6)
|
2
|
Channel structure placement (C.4.d.1) |
|
Miles of Stream Treated for channel structure placement (C.4.d.3)
|
0.20
|
|
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
|
0.8
|
|
Pools Created through channel structure placement (C.4.d.5)
|
2
|
|
Number of structures placed in channel (C.4.d.7)
|
30
|
Spawning gravel placement (C.4.f.1) |
|
Miles of Stream Treated with spawning gravel placement (C.4.f.2)
|
0.20
|
|
Cubic Yards of spawning gravel placed (C.4.f.3)
|
650
|
Riparian Habitat Project |
Planting (C.5.c.1) |
|
Acres Planted in riparian (C.5.c.3)
|
1.8
|
Permits |
Obtain permits |
|
Number of permits required for implementation of project
|
3
|