Jon Small Off-Channel Rearing Pond
    Project Details    
Trout Unlimited Icicle Vly; Jon Small Off-Channel Rearing Pond (#00-1167)

07/15/2004, Attachment #32903, Jon Small pond
Trout Unlimited Icicle Vly; Jon Small Off-Channel Rearing Pond (#00-1167) 07/15/2004, Attachment #32903, Jon Small pond

Trout Unlimited Icicle Vly; Jon Small Off-Channel Rearing Pond (#00-1167)

07/15/2004, Attachment #32903, Jon Small pond Trout Unlimited Icicle Vly; Jon Small Off-Channel Rearing Pond (#00-1167)

07/05/2004, Attachment #32908, Rock groins in mainstrem of EntiatTrout Unlimited Icicle Vly; Jon Small Off-Channel Rearing Pond (#00-1167)

07/15/2004, Attachment #32910, Off channel, looking upstream into pond
Project Status:  Closed Completed since 07/07/2006
 
Project Type:  Restoration
Project Sponsor:  Trout Unlimited Icicle Valley
Funding Board:  Salmon Recovery Funding Board
              Funding  
Salmon State Projects: $133,751
Total RCO Grant: $133,751 (68%)
Sponsor Match: $62,091 (32%)
Total Agreement: $195,842 (100%)
              Links
 

    Project Description    
This is a cooperative salmon & steelhead habitat restoration, enhancement, & bioengineering project between a private landowner (local orchardist Jon Small), Trout Unlimited (TU), WDFW, USFS, Chelan County Public Works Department & others aimed at helping endangered spring chinook salmon, endangered summer steelhead trout & other anadromous & resident salmonids (including threatened resident bull trout) within the lower Entiat River drainage. The Entiat River lies within the Upper Columbia River Evolutionary Significant Unit (ESU) & harbors 3 federally listed salmonid species including spring chinook salmon & summer steelhead (Endangered), & bull trout (Threatened. This project, designed & engineered by WDFW, will create approximately 0.4 mile of high quality, year-round off-channel salmon & steelhead rearing habitat on WDFW owned land adjacent the mainstem Entiat River at rivermile 6.5 just upstream of Roaring Creek. Lack of juvenile rearing habitat (overwintering) is the most limiting factor within the Entiat watershed. The objectives are to create 0.2 a. off-channel rearing pond, create a meandering 1000 ft. off-channel rearing channel exiting the pond & connecting to the Entiat R., & restore 1000 ft. of previously channelized & degraded in-channel rearing habitat & eroding banks through bioengineering & placement of instream rock & fish habitat structures. TU & WDFW will design & construct the project and WDFW will implement the monitoring plan.

    Project Contacts    
         
Project Sponsor: Trout Unlimited Icicle Valley Lead Entity: Upper Columbia Salmon Recovery Board Lead Entity
  Project Contact: Jan Carpenter

(509) 548-1421
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Amee Bahr
Amee.Bahr@rco.wa.gov
(360) 867-8585
   

    Project Location    
General Area:   Entiat River downstream of Roaring Creek
County:   Chelan
Legislative District:   12
Congressional District 2022:   08
Salmon Recovery Regions:   Upper Columbia River
Watershed Administrative Unit:   Lower Entiat
HUC8:   Upper Columbia-Entiat (17020010)
WRIA:   Entiat
Sections:   10
Township:   T25NR20E
Coordinates:   47.68156801
-120.31243748

    Worksites    
Worksite NameScope of WorkActual Restoration Cost
Entiat River (#1) Architectural & Engineering (A&E), Artificial wetland created (C.8.f.1), Channel reconfiguration and connectivity (C.4.c.1), Channel structure placement (C.4.d.1), Fish passage blockages removed or altered (C.2.c.1), Implementation monitoring, Obtain permits, Other restoration activities, Plant removal/control (C.4.g.1), Spawning gravel placement (C.4.f.1), Streambank stabilization (C.4.e.1), Wetland plant removal / control (C.8.d.1) $196,945
 Total$196,945
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Entiat River (#1)   Property 1 - Property - Worksite #1 Private
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

Fish Passage Improvement
      Fish passage blockages removed or altered (C.2.c.1)
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2) 1

Instream Habitat Project
      Channel reconfiguration and connectivity (C.4.c.1)
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3) 0.19
Miles of Off-Channel Stream Created or Connected (C.4.c.4) 0.19
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5) 0.4
Instream Pools Created/Added (C.4.c.6) 1
      Channel structure placement (C.4.d.1)
Miles of Stream Treated for channel structure placement (C.4.d.3) 0.19
Acres Of Streambed Treated for channel structure placement (C.4.d.4) 0.4
Pools Created through channel structure placement (C.4.d.5) 1
Number of structures placed in channel (C.4.d.7) 6
      Streambank stabilization (C.4.e.1)
Miles of Streambank Stabilized (C.4.e.3) 0.10

Wetland Project
      Artificial wetland created (C.8.f.1)
Artificial Wetland Acres Created (C.8.f.2) 0.2

Fish Passage Improvement
      
Number of blockages / impediments / barriers impeding passage (C.2.b.4) 1

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 05/01/2000
Monitoring Started 08/01/2000
RFP Complete/Consultant Hired 08/15/2000
Monitor/Steward Plan Complete 08/15/2000
A&E Complete/Permits Submitted 03/01/2003
Bid Awarded 03/01/2003
Construction Started 05/01/2003
Construction Complete 04/30/2005
Monitoring Complete 04/30/2005
Agreement End Date 04/30/2005
Final Docs/Billing to Mgmt Agy 05/30/2005


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Agreement - State 00-1167 Agreement & General Provisions 05/24/00.pdf 09/10/2007
Application Document 00-1167 3 regional maps including contours.pdf 09/10/2007
Photo Jon Small off-channel, looking upstream.jpg 05/30/2006
Photo Off channel, looking upstream into pond.jpg 05/30/2006
Photo Rock groins in mainstrem of Entiat.jpg 05/30/2006
Photo Jon Small pond.jpg 05/30/2006

Back to top Date of last change: 12/13/2022