Jon Small Off-Channel Rearing Pond
|
Trout Unlimited Icicle Vly; Jon Small Off-Channel Rearing Pond (#00-1167)
07/15/2004, Attachment #32903, Jon Small pond
|
|
|
    Funding |
  |
|
    Links |
  |
|
|
This is a cooperative salmon & steelhead habitat restoration, enhancement, & bioengineering project between a private landowner (local orchardist Jon Small), Trout Unlimited (TU), WDFW, USFS, Chelan County Public Works Department & others aimed at helping endangered spring chinook salmon, endangered summer steelhead trout & other anadromous & resident salmonids (including threatened resident bull trout) within the lower Entiat River drainage. The Entiat River lies within the Upper Columbia River Evolutionary Significant Unit (ESU) & harbors 3 federally listed salmonid species including spring chinook salmon & summer steelhead (Endangered), & bull trout (Threatened. This project, designed & engineered by WDFW, will create approximately 0.4 mile of high quality, year-round off-channel salmon & steelhead rearing habitat on WDFW owned land adjacent the mainstem Entiat River at rivermile 6.5 just upstream of Roaring Creek. Lack of juvenile rearing habitat (overwintering) is the most limiting factor within the Entiat watershed. The objectives are to create 0.2 a. off-channel rearing pond, create a meandering 1000 ft. off-channel rearing channel exiting the pond & connecting to the Entiat R., & restore 1000 ft. of previously channelized & degraded in-channel rearing habitat & eroding banks through bioengineering & placement of instream rock & fish habitat structures. TU & WDFW will design & construct the project and WDFW will implement the monitoring plan.
|
General Area:
|
|
Entiat River downstream of Roaring Creek
|
County:
|
|
Chelan
|
Legislative District:
|
|
12
|
Congressional District 2022:
|
|
08
|
Salmon Recovery Regions:
|
|
Upper Columbia River
|
Watershed Administrative Unit:
|
|
Lower Entiat
|
HUC8:
|
|
Upper Columbia-Entiat (17020010)
|
WRIA:
|
|
Entiat
|
Sections:
|
|
10
|
Township:
|
|
T25NR20E
|
Coordinates:
|
|
47.68156801 -120.31243748
|
|
|
Worksite Name | Scope of Work | Actual Restoration Cost |
Entiat River (#1)
|
Architectural & Engineering (A&E), Artificial wetland created (C.8.f.1), Channel reconfiguration and connectivity (C.4.c.1), Channel structure placement (C.4.d.1), Fish passage blockages removed or altered (C.2.c.1), Implementation monitoring, Obtain permits, Other restoration activities, Plant removal/control (C.4.g.1), Spawning gravel placement (C.4.f.1), Streambank stabilization (C.4.e.1), Wetland plant removal / control (C.8.d.1)
|
$196,945
|
| Total | $196,945 |
Amounts may not be complete
Worksite Name | | Property Name | Landowner Type |
Entiat River (#1)
|
|
Property 1 - Property - Worksite #1
|
Private
|
| | | Total |
Amounts may not be complete
| Category / Work Type / Metric | Final |
Restoration Metrics (rolled up from Worksite level) |
Fish Passage Improvement |
Fish passage blockages removed or altered (C.2.c.1) |
|
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
|
1
|
Instream Habitat Project |
Channel reconfiguration and connectivity (C.4.c.1) |
|
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
|
0.19
|
|
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
|
0.19
|
|
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
|
0.4
|
|
Instream Pools Created/Added (C.4.c.6)
|
1
|
Channel structure placement (C.4.d.1) |
|
Miles of Stream Treated for channel structure placement (C.4.d.3)
|
0.19
|
|
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
|
0.4
|
|
Pools Created through channel structure placement (C.4.d.5)
|
1
|
|
Number of structures placed in channel (C.4.d.7)
|
6
|
Streambank stabilization (C.4.e.1) |
|
Miles of Streambank Stabilized (C.4.e.3)
|
0.10
|
Wetland Project |
Artificial wetland created (C.8.f.1) |
|
Artificial Wetland Acres Created (C.8.f.2)
|
0.2
|
Fish Passage Improvement |
|
|
Number of blockages / impediments / barriers impeding passage (C.2.b.4)
|
1
|
Milestone Name | Target Date | Description |
Project Start
|
05/01/2000
|
|
Monitoring Started
|
08/01/2000
|
|
RFP Complete/Consultant Hired
|
08/15/2000
|
|
Monitor/Steward Plan Complete
|
08/15/2000
|
|
A&E Complete/Permits Submitted
|
03/01/2003
|
|
Bid Awarded
|
03/01/2003
|
|
Construction Started
|
05/01/2003
|
|
Construction Complete
|
04/30/2005
|
|
Monitoring Complete
|
04/30/2005
|
|
Agreement End Date
|
04/30/2005
|
|
Final Docs/Billing to Mgmt Agy
|
05/30/2005
|
|