Skip to main content
Save as PDF
Washington State Recreation and Conservation Office
Project Snapshot
PRISM Project #00-1672 (Other)
Crescent Bay Salt Marsh/Salmon Hab. Rest
    Project Details    
Island County of; Crescent Bay Salt Marsh/Salmon Hab. Rest (#00-1672)

11/23/2004, Attachment #13818, Crescent Bay channel into estuary
Island County of; Crescent Bay Salt Marsh/Salmon Hab. Rest (#00-1672) 11/23/2004, Attachment #13818, Crescent Bay channel into estuary

Island County of; Crescent Bay Salt Marsh/Salmon Hab. Rest (#00-1672)

11/23/2004, Attachment #13818, Crescent Bay channel into estuary
Project Status:  Not Completed since 05/17/2005
 
Project Type:  Restoration
Project Sponsor:  Island County
Funding Board:  Salmon Recovery Funding Board
              Funding  
Salmon Federal Projects: $264,674
Total RCO Grant: $264,674 (72%)
Sponsor Match: $102,570 (28%)
Total Agreement: $367,244 (100%)
              Links
 

    Project Description    
We propose to remove the tidegate, restore and open channel connection to Crescent Bay and eliminate the Marsh's drainage ditches and dikes. As a result, juvenile salmon habitat and other wetland functions will be restored to Crescent Bay Salt Marsh, Naval Air Station Whidbey Island, significantly increasing the area and quality of estuarine habitat for juvenile salmon rearing along northern Puget Sound shorelines. These actions will promote natural access and use by juvenile salmon and other fishes to the Marsh and linkages to the Crescent Bay ecosystem.

The initial 3-year phase of the project will involve pre-construction, baseline ecological assessment, engineering feasibility, hydrological and geomorphological design, construction and post-construction evaluation. A second SRFB proposal will be submitted in Year 3 using initial monitoring results to develop and implement a long-term (e.g. 10 yr) monitoring and adaptive management plan.

Island County, will manage the project including; the restoration design in collaboration with hydrologists and geomorphologists from Phillip Williams and Associates; the Corps of Engineers providing technical expertise on the flood study; the Navy and SeaBees removing the tidegate and dikes, excavating the entrance channel and modifying the interior ditches; and, the NASWI managing the Beach Watcher, Oak Harbor Middle School and Boy Scout volunteers for monitoring and revegetation.

    Project Contacts    
         
Project Sponsor: Island County Lead Entity: Island County Lead Entity
  Project Contact: Charles Simenstad
simenstd@uw.edu
(206) 543-7185
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Bridget Kaminski
bridget.kaminski@rco.wa.gov
(360) 472-5546
   

    Project Location    
General Area:   Whidbey Island, Crescent Bay Salt Marsh on Naval Air Station.
Waterbody:   Crescent Creek, drains into Crescent Bay, Unnamed
County:   Island
Legislative District:   10
Congressional District 2022:   02
Salmon Recovery Regions:   Puget Sound
Watershed Administrative Unit:   Whidbey Island
HUC8:   Puget Sound (17110019)
WRIA:   Island
Coordinates:   48.29730358
-122.60586392

    Worksites    
Worksite NameScope of WorkProposed Restoration Cost
Crescent Bay Salt Marsh/Salmon Hab.Rest. (#1) Architectural & Engineering (A&E), Artificial wetland created (C.8.f.1), Channel reconfiguration and connectivity (C.4.c.1), Fish passage blockages removed or altered (C.2.c.1), Implementation monitoring, Obtain permits, Other restoration activities, Plant removal/control (C.4.g.1), Streambank stabilization (C.4.e.1), Wetland plant removal / control (C.8.d.1) $125,780
 Total$125,780
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Crescent Bay Salt Marsh/Salmon Hab.Rest. (#1)   Property 1 - Property - Worksite #1 Federal Government
   Total
Amounts may not be complete

    Project Permits    
Permit TypeApplied
Date
Received
Date
Expiration
Date
Permit Number
Dredge/Fill Permit [Section 10/404 or 404]
Endangered Species Act Compliance [ESA]
Hydraulics Project Approval [HPA]
NEPA
Water Quality Certification [Section 401]

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 02/15/2001
Monitoring Started 02/15/2001
Monitor/Steward Plan Submitted 08/01/2001
Applied for Permits 01/02/2004 Phase 1 - No permits needed. Ph. 2 - pre-ap 9/1/01
A&E Plans Submitted 01/02/2004 Ph 1 - completed. Ph 2 - 90% draft
Bid Awarded/Consultant Hired 03/31/2004 Construction
Construction Started 08/15/2004 Ph 1 - berm removal 8/15/01. Ph 2 - channel work.
Construction Complete 10/15/2004 Ph 1 - complete 10/0101.
Agreement End Date 05/30/2005
Monitoring Complete 06/30/2005
Final Docs/Billing to Mgmt Agy 06/30/2005

NOTE: This data is subject to change.

    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Photo Crescent Bay channel into estuary.jpg 02/25/2005
Photo CrescentTidegate.jpg 02/25/2005
Photo Crescent Tidegate.jpg 02/25/2005
Photo Crescent Gate and Road.jpg 02/25/2005
Photo Crescent Estuary&Dike.jpg 02/25/2005
Photo Crescent Bay sponsors.jpg 02/25/2005
Photo Crescent Bay Channel.jpg 02/25/2005

Back to top Date of last change: 12/05/2024