Project Snapshot
PRISM Project #00-1838 (Completed)
Beckler Road Decommissioning
    Project Details    
Tulalip Tribes; Beckler Road Decommissioning (#00-1838)

Attachment #14250, FS  stream crossing on road abdn 11-20-02
Tulalip Tribes; Beckler Road Decommissioning (#00-1838) Attachment #14250, FS stream crossing on road abdn 11-20-02

Tulalip Tribes; Beckler Road Decommissioning (#00-1838)

Attachment #14250, FS  stream crossing on road abdn 11-20-02
Project Status:  Closed Completed since 04/22/2005
 
Project Type:  Restoration
Project Sponsor:  Tulalip Tribes
Funding Board:  Salmon Recovery Funding Board
              Funding  
Salmon Federal Projects: $170,104
Total RCO Grant: $170,104 (40%)
Sponsor Match: $250,200 (60%)
Total Agreement: $420,304 (100%)
              Links
 

    Project Description    
This project decommissions 24 miles of roads within the Beckler watershed, located 50 miles east of Everett within the Skykomish Basin. Decommission treatments range from total removal of the road prism and complete recontouring of the hillside to approximately a natural slope, to some combination of removing culverts, removing unstable road fill, scarifying road beds, and waterbarring. Work also includes stormproofing 15 miles of road that are to be retained that currently deliver sediment to streams. The objective is to largely restore and stabilize slopes that are currently contributing sediment to salmon bearing streams (including the Beckler and Rapid Rivers) through surface erosion, and/or have high risks of contributing very large volumes of sediment through mass failures associated with the current road system. The anticipated product would be a largely self-maintaining drainage system. The work is spread over several square miles (see project map). This project would benefit chinook salmon and bull trout, as well as several other salmon and trout species within the watershed. Direct, near-term benefits will occur through the reduction of ongoing chronic delivery of sediments into otherwise valuable chinook and bull trout habitat. When combined with previous restoration work already completed by the USFS, this key project will greatly help restore the Beckler watershed to the refugia its capable of being.


    Project Contacts    
         
Project Sponsor: Tulalip Tribes Lead Entity: Snohomish Basin Lead Entity
  Project Contact: Kurt Nelson
knelson@tulaliptribes-nsn.gov
(360) 716-4617
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Amee Bahr
Amee.Bahr@rco.wa.gov
(360) 867-8585
   

    Project Location    
General Area:   The project(s) are located within the Mt. Baker-Snoqualmie National Forest in the Beckler River Watershed
Waterbody:   Beckler River, Unnamed
County:   King
Legislative District:   12
Congressional District 2022:   08
Salmon Recovery Regions:   Puget Sound
Watershed Administrative Unit:   Beckler River
HUC8:   Skykomish (17110009)
WRIA:   Snohomish
Sections:   14
Township:   T26NR11E
Coordinates:   47.74142409
-121.34817537

    Worksites    
Worksite NameScope of WorkActual Restoration Cost
Beckler Road Decommissioning (#1) Architectural & Engineering (A&E), Road abandonment (C.6.d.1), Road drainage system improvements and reconstruction (C.6.c.1) $170,105
 Total$170,105
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Beckler Road Decommissioning (#1)   Property 1 - Property - Worksite #1 Federal Government
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

Upland Habitat And Sediment Project
      Road drainage system improvements and reconstruction (C.6.c.1)
Miles of Road Treated for drainage improvements and reconstruction (C.6.c.2) 13.86
      Road abandonment (C.6.d.1)
Miles of Road Abandoned (C.6.d.2) 9.43

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 02/01/2001
A&E Plans Submitted 05/31/2001 Construction Contract
Monitor/Steward Plan Submitted 05/31/2001
Bid Awarded/Consultant Hired 06/30/2001
Monitoring Started 07/16/2001 Ongoing with implementation
Construction Started 08/01/2002 Pending ESA timing restrictions
Construction Complete 11/15/2004
Monitoring Complete 11/30/2004
Agreement End Date 12/31/2004
Final Docs/Billing to Mgmt Agy 03/31/2005


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Photo FS 6540-110 Decommision.jpg 04/15/2005
Photo FS 6540 Decommision.jpg 04/15/2005
Photo View of slide 6530.jpg 04/01/2005
Photo Slide 6530.jpg 04/01/2005
Photo Culvert Outlet 3.jpg 04/01/2005
Photo Culvert Outlet 2.jpg 04/01/2005
Photo Culvert Outlet1.jpg 04/01/2005
Photo Rapid River.jpg 04/01/2005
Photo Drainage Culvert Perched Outlet.jpg 04/01/2005
Photo Drainage Culvert Cut Inlet.jpg 04/01/2005
Photo Drainage Culvert Inlet.jpg 04/01/2005
Photo Drainage Culvert Outlet.jpg 04/01/2005
Photo FS stream crossing road abdn 2 11-19-02.jpg 03/25/2005
Photo FS stream crossing on road abdn 11-20-02.jpg 03/25/2005
Photo FS road abdn 4 11-19-02.jpg 03/25/2005
Photo FS road abdn 2 11-20-02.jpg 03/25/2005
Project Application Report 00-1838D Beckler Rd. Decommissioning.pdf 12/29/2015