Crescent Harbor Marsh Restoration
|
Skagit River Sys Cooperative; Crescent Harbor Marsh Restoration (#04-1217)
Attachment #87672, P1000657
|
|
|
    Funding |
  |
|
    Links |
  |
|
|
Arrowhead Lagoon (AL) is a nearshore pocket estuary located along the north shore of Camano Island. The lagoon is located along the path of currents from the Skagit and Stillaguamish Rivers, thereby providing refuge, foraging, and rearing opportunity for fry migrant Chinook, as well as a nursery and nearshore habitat for other estuarine/marine fish species.
Skagit River System Cooperative (SRSC), in cooperation with local landowners, proposes to restore approximately 2.0 acres of intertidal habitat within the eastern portion of AL. Currently natural ecosystem function is impaired due to manmade constrictions within the inner lagoon. Actions will include removal of trail fill, a failing culvert, and a short bridge; construction of a new bridge; removal of fill along the northern interior shoreline; and revegetation in selected areas.
This restoration proposal is timely because local landowners, represented by the Eagle Tree Estates Property Owners' Association (ETEPOA), have requested assistance for a failing culvert in the existing beach access trail fill. Removal of fill and construction of a spanning bridge would result in significant ecological improvement compared to the proposed culvert replacement alone. SRSC will work closely with the property owners to address beach access concerns and maximize restoration
|
General Area:
|
|
Arrowhead Lagoon at East End of Arrowhead Beach and neighborhood.
Crescent Harbor Salt Marsh on Whidbey Island, in Island County, WA
|
County:
|
|
Island
|
Legislative District:
|
|
10
|
Congressional District 2022:
|
|
02
|
Salmon Recovery Regions:
|
|
Puget Sound
|
Watershed Administrative Unit:
|
|
Whidbey Island
|
HUC8:
|
|
Puget Sound (17110019)
|
WRIA:
|
|
Island
|
Sections:
|
|
31
|
Township:
|
|
T33NR02E
|
Coordinates:
|
|
48.29960494 -122.60908687
|
|
|
Worksite Name | Scope of Work | Actual Restoration Cost |
Crescent Harbor Salt Marsh (#1)
|
Architectural & Engineering (A&E), Bridge installed or improved (C.2.g.1), Channel modification (C.9.c.1), Creation of new estuarine area (C.9.q.1), Fish passage blockages removed or altered (C.2.c.1)
|
$260,150
|
| Total | $260,150 |
Amounts may not be complete
Worksite Name | | Property Name | Landowner Type |
Crescent Harbor Salt Marsh (#1)
|
|
Property 1 - Crescent Harbor NASWI
|
Federal Government
|
| | | Total |
Amounts may not be complete
| Category / Work Type / Metric | Final |
Restoration Metrics (rolled up from Worksite level) |
Fish Passage Improvement |
Fish passage blockages removed or altered (C.2.c.1) |
|
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
|
1
|
Estuarine / Nearshore Project |
Channel modification (C.9.c.1) |
|
Yards (linear measure) of Channel Modified/Created (C.9.c.2)
|
3646
|
|
Acres of Estuary Treated (C.9.c.3)
|
6.8
|
Creation of new estuarine area (C.9.q.1) |
|
Acres of Estuary Created (C.9.q.2)
|
205.0
|
Fish Passage Improvement |
Bridge installed or improved (C.2.g.1) |
|
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
|
0.50
|
|
Number of bridges (C.2.g.2)
|
1
|
|
|
Number of blockages / impediments / barriers impeding passage (C.2.b.4)
|
1
|
Milestone Name | Target Date | Description |
Project Start
|
01/01/2005
|
|
RFP Complete
|
01/31/2005
|
|
Applied for Permits
|
01/31/2005
|
|
A&E Plans Submitted
|
01/31/2005
|
|
Bid Awarded/Consultant Hired
|
05/01/2007
|
|
Construction Started
|
08/01/2008
|
|
Construction Complete
|
06/01/2009
|
|
Agreement End Date
|
06/30/2009
|
|
Final Docs/Billing to Mgmt Agy
|
09/30/2009
|
|