PRISM Project #04-1217 (Completed)
Crescent Harbor Marsh Restoration
    Project Details    
Skagit River Sys Cooperative; Crescent Harbor Marsh Restoration (#04-1217)

Attachment #87672, P1000657
Skagit River Sys Cooperative; Crescent Harbor Marsh Restoration (#04-1217) Attachment #87672, P1000657

Skagit River Sys Cooperative; Crescent Harbor Marsh Restoration (#04-1217)

Attachment #87672, P1000657 Skagit River Sys Cooperative; Crescent Harbor Marsh Restoration (#04-1217)

Attachment #8368, Figure1Skagit River Sys Cooperative; Crescent Harbor Marsh Restoration (#04-1217)

Attachment #87683, P1000668
Project Status:  Closed Completed since 12/17/2010
 
Project Type:  Restoration
Project Sponsor:  Skagit River System Cooperative
Funding Board:  Salmon Recovery Funding Board
              Funding  
Salmon State Projects: $221,127
Total RCO Grant: $221,127 (85%)
Sponsor Match: $39,023 (15%)
Total Agreement: $260,150 (100%)
              Links
 

    Project Description    
Arrowhead Lagoon (AL) is a nearshore pocket estuary located along the north shore of Camano Island. The lagoon is located along the path of currents from the Skagit and Stillaguamish Rivers, thereby providing refuge, foraging, and rearing opportunity for fry migrant Chinook, as well as a nursery and nearshore habitat for other estuarine/marine fish species.

Skagit River System Cooperative (SRSC), in cooperation with local landowners, proposes to restore approximately 2.0 acres of intertidal habitat within the eastern portion of AL. Currently natural ecosystem function is impaired due to manmade constrictions within the inner lagoon. Actions will include removal of trail fill, a failing culvert, and a short bridge; construction of a new bridge; removal of fill along the northern interior shoreline; and revegetation in selected areas.

This restoration proposal is timely because local landowners, represented by the Eagle Tree Estates Property Owners' Association (ETEPOA), have requested assistance for a failing culvert in the existing beach access trail fill. Removal of fill and construction of a spanning bridge would result in significant ecological improvement compared to the proposed culvert replacement alone. SRSC will work closely with the property owners to address beach access concerns and maximize restoration

    Project Contacts    
         
Project Sponsor: Skagit River System Cooperative Lead Entity: Island County Lead Entity
  Project Contact: Devin Smith
dsmith@skagitcoop.org
(360) 391-1984
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Bridget Kaminski
bridget.kaminski@rco.wa.gov
(360) 472-5546
   

    Project Location    
General Area:   Arrowhead Lagoon at East End of Arrowhead Beach and neighborhood. Crescent Harbor Salt Marsh on Whidbey Island, in Island County, WA
County:   Island
Legislative District:   10
Congressional District 2022:   02
Salmon Recovery Regions:   Puget Sound
Watershed Administrative Unit:   Whidbey Island
HUC8:   Puget Sound (17110019)
WRIA:   Island
Sections:   31
Township:   T33NR02E
Coordinates:   48.29960494
-122.60908687

    Worksites    
Worksite NameScope of WorkActual Restoration Cost
Crescent Harbor Salt Marsh (#1) Architectural & Engineering (A&E), Bridge installed or improved (C.2.g.1), Channel modification (C.9.c.1), Creation of new estuarine area (C.9.q.1), Fish passage blockages removed or altered (C.2.c.1) $260,150
 Total$260,150
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Crescent Harbor Salt Marsh (#1)   Property 1 - Crescent Harbor NASWI Federal Government
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

Fish Passage Improvement
      Fish passage blockages removed or altered (C.2.c.1)
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2) 1

Estuarine / Nearshore Project
      Channel modification (C.9.c.1)
Yards (linear measure) of Channel Modified/Created (C.9.c.2) 3646
Acres of Estuary Treated (C.9.c.3) 6.8
      Creation of new estuarine area (C.9.q.1)
Acres of Estuary Created (C.9.q.2) 205.0

Fish Passage Improvement
      Bridge installed or improved (C.2.g.1)
Miles of stream made accessible by bridge installation/repair (C.2.g.3) 0.50
Number of bridges (C.2.g.2) 1
      
Number of blockages / impediments / barriers impeding passage (C.2.b.4) 1

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 01/01/2005
RFP Complete 01/31/2005
Applied for Permits 01/31/2005
A&E Plans Submitted 01/31/2005
Bid Awarded/Consultant Hired 05/01/2007
Construction Started 08/01/2008
Construction Complete 06/01/2009
Agreement End Date 06/30/2009
Final Docs/Billing to Mgmt Agy 09/30/2009


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Agreement - State 04-1217 Agreement.pdf 01/27/2012
Amendment request ESRP Application Appendices.pdf 10/10/2007
Amendment request ESRP application for Crescent Harbor project .pdf 10/10/2007
Amendment request Scope Change: Crescent Harbor Maps and Designs .pdf 10/10/2007
Amendment request Scope Change Approval 10.9.07.pdf 10/10/2007
Application authorization Application Authorization Memorandum.pdf 06/09/2004
Correspondence Lead Entity Letter of Support Scope Change.pdf 10/10/2007
Correspondence Navy Letter of Support for Scope Change.pdf 10/10/2007
Correspondence Nearshore Evaluation.pdf 08/27/2004
Design document (as built) West Dike Notch Weir 090109.pdf 03/09/2010
Design document (as built) Crescent Harbor Restoration Culvert As-Built.pdf 03/09/2010
Design document (as built) Crescent Final Drawing Package.pdf 03/09/2010
Evaluation proposal Evaluation Proposal.pdf 06/09/2004
Final project report 04-1217R Final Report 12/31/09.pdf 03/09/2010
Landowner acknowledgement form Landowner willingness forms.pdf 06/09/2004
Map Refined Proposal 050405.jpg 07/15/2005
Map Figure3.jpg 06/08/2004
Map Figure2.jpg 06/08/2004
Map Figure1.jpg 06/08/2004
Map Photos 3&4.pdf 03/31/2004
News Article News Clip Fall/09.pdf 12/07/2009
Photo P1000674.jpg 12/14/2009
Photo P1000673.jpg 12/14/2009
Photo P1000672.jpg 12/14/2009
Photo P1000671.jpg 12/14/2009
Photo P1000670.jpg 12/14/2009
Photo P1000669.jpg 12/14/2009
Photo P1000668.jpg 12/14/2009
Photo P1000667.jpg 12/14/2009
Photo P1000666.jpg 12/14/2009
Photo P1000665.jpg 12/14/2009
Photo P1000664.jpg 12/14/2009
Photo P1000663.jpg 12/14/2009
Photo P1000662.jpg 12/14/2009
Photo P1000661.jpg 12/14/2009
Photo P1000660.jpg 12/14/2009
Photo P1000659.jpg 12/14/2009
Photo P1000658.jpg 12/14/2009
Photo P1000657.jpg 12/14/2009
Photo P1000656.jpg 12/14/2009
Photo P1000655.jpg 12/14/2009
Photo P1000654.jpg 12/14/2009
Photo P1000653.jpg 12/14/2009
Photo P1000652.jpg 12/14/2009
Photo P1000651.jpg 12/14/2009
Photo ArrowSpit.jpg 02/25/2005
Photo ArrowBeachEstatesDike3.jpg 02/25/2005
Photo Arrowhead inlet.jpg 02/25/2005
Photo Arrowinlet2.jpg 02/25/2005
Photo Arrowhead Culvert.jpg 02/25/2005
Photo ArrowBridge3.jpg 02/25/2005
Photo ArrowheadBridge1.jpg 02/25/2005
Photo ArrowEstuarybridgeestates2.jpg 02/25/2005
Photo ArrowheadOverviewPP.jpg 02/25/2005
Progress report Progress Report 1.pdf 06/14/2005
SRFB Review Panel Comment Form 04-1217 SRFB Comment Form.pdf 07/28/2015
Visuals Photos.ppt 12/29/2009