Entiat R. BridgeToBridge Reach Rest. Ph1
|
Cascadia Conservation District; Entiat R. BridgeToBridge Reach Rest. Ph1 (#04-1503)
02/22/2008, Attachment #59528, P1010982
|
|
|
    Funding |
  |
|
    Links |
  |
|
|
The CCCD, on behalf of the Entiat WRIA Planning Unit (EWPU), will implement Phase I of a full ~1.2 RM reach restoration in the lower mainstem Entiat River. The "Bridge-to-Bridge" (B-to-B) reach (~RM 3.2 to RM 4.4) is the highest priority restoration area in WRIA 46. Past activities that have altered the lower Entiat River include logging, dams, stream clearing; channelization, filling & flood control protection works. Riparian vegetation has been removed by fire & development. The B-to-B effort addresses lack of off-channel rearing habitat, temperature extremes & habitat simplicity. It will restore geomorphology, floodplain function, habitat complexity/diversity, off-channel habitat, and shading, benefiting adult & juvenile Chinook, steelhead & coho. At the end of Phase 3, the reach will be restored to its geomorphic potential (e.g. now 0.3 pools/mi, restored to 9 pools/mi). The EWPU supports this 3-phase project, developed via 10 years of planning. Actions proposed are based on geomorphic, biologic, hydrologic & thermal analyses. Funding for Phase 1 will be used to: (a) restore ~1000 contiguous ft. of riparian vegetation to improve stream temperatures, bank condition, cover, nutrient inputs; (b) provide juvenile off-channel rearing habitat via rock/LWD placement in ~700 ft. irrigation ditch; (c) install 2 instream structures to direct flow to the off-channel habitat and restore resting pools in the lowest portion of the reach. A ditch outfall structure will also be added.
|
General Area:
|
|
RM 3.2-4.4 of the Entiat River
|
Waterbody:
|
|
Columbia River, Entiat River, Phase I - Lower Bridge area
|
County:
|
|
Chelan
|
Legislative District:
|
|
12
|
Congressional District 2022:
|
|
08
|
Salmon Recovery Regions:
|
|
Upper Columbia River
|
Watershed Administrative Unit:
|
|
Lower Entiat
|
HUC8:
|
|
Upper Columbia-Entiat (17020010)
|
WRIA:
|
|
Entiat
|
Sections:
|
|
13
|
Township:
|
|
T25NR20E
|
Coordinates:
|
|
47.66819355 -120.28118495
|
|
|
Worksite Name | Scope of Work | Actual Restoration Cost |
Entiat R. Bridge to Bridge Rest. (#1)
|
Architectural & Engineering (A&E), Channel reconfiguration and connectivity (C.4.c.1), Channel structure placement (C.4.d.1), Obtain permits, Other restoration activities, Planting (C.5.c.1), Streambank stabilization (C.4.e.1)
|
$146,354
|
| Total | $146,354 |
Amounts may not be complete
Worksite Name | | Property Name | Landowner Type |
Entiat R. Bridge to Bridge Rest. (#1)
|
|
Property 1 - Property - Worksite #1
|
Private
|
| | | Total |
Amounts may not be complete
| Category / Work Type / Metric | Final |
Restoration Metrics (rolled up from Worksite level) |
Instream Habitat Project |
Channel reconfiguration and connectivity (C.4.c.1) |
|
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
|
0.32
|
|
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
|
0.13
|
|
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
|
0.2
|
|
Instream Pools Created/Added (C.4.c.6)
|
4
|
Channel structure placement (C.4.d.1) |
|
Miles of Stream Treated for channel structure placement (C.4.d.3)
|
0.15
|
|
Pools Created through channel structure placement (C.4.d.5)
|
4
|
|
Number of structures placed in channel (C.4.d.7)
|
2
|
Riparian Habitat Project |
Planting (C.5.c.1) |
|
Acres Planted in riparian (C.5.c.3)
|
0.6
|
Permits |
Obtain permits |
|
Number of permits required for implementation of project
|
5
|
Milestone Name | Target Date | Description |
Project Start
|
01/03/2005
|
|
Construction Started
|
08/01/2006
|
May be as early as Aug 2005
|
Construction Complete
|
10/31/2006
|
May be as early as Oct 2005
|
Agreement End Date
|
06/30/2008
|
Allows for replanting if needed
|
Final Docs/Billing to Mgmt Agy
|
08/15/2008
|
|