Niepoth Iguchi - Cool Cr R3
|
Mid-Puget Sound Fish Enh Grp; Niepoth Iguchi - Cool Cr R3 (#05-1119)
05/04/2005, Attachment #15348, NiepothDSculvert1
|
|
|
    Funding |
  |
|
    Links |
  |
|
|
This project will replace a 36-inch CMP culvert on a private driveway serving 5-6 residences on Cool Creek, Kitsap County, WA. The new culvert will be 11 feet in diameter, and will conform to WDFW's no-slope method as recommended by WDFW engineering staff. The existing culvert represents a partial barrier to upstream fish migration. This stream is known to support both coho salmon and resident cuthroat trout. Other native fish species may also be present. Both the upstream and downstream habitat is considered "excellent". This project will provide full, unimpeded fish passage to 0.94 miles of upstream habitat (location of next complete passage barrier). Additionally, this project could provide incentive to correct this upstream barrier, provding fish passage to the remaining 0.61 miles. This would result in a total gain of 1.55 miles of excellent fish habitat. In addition to the FFFPP grant program, Landowners and Mid Sound Fisheries, the Kitsap Conservation District has provided funds for survey and initial design work, and continue to be a project partner.
|
General Area:
|
|
near Port Orchard
|
Waterbody:
|
|
Unnamed
|
County:
|
|
Kitsap
|
Legislative District:
|
|
26
|
Congressional District 2022:
|
|
06
|
Salmon Recovery Regions:
|
|
Puget Sound
|
Watershed Administrative Unit:
|
|
Clovos Passage/Carr Inlet
|
HUC8:
|
|
Puget Sound (17110019)
|
WRIA:
|
|
Kitsap
|
Sections:
|
|
07
|
Township:
|
|
T23NR02E
|
Coordinates:
|
|
47.50052841 -122.60706035
|
|
|
Worksite Name | Scope of Work | Actual Restoration Cost |
Niepoth (#1)
|
Architectural & Engineering (A&E), Culvert installed or improved (C.2.f.1), Fish passage blockages removed or altered (C.2.c.1), Road-crossing removal (C.2.i.1)
|
$19,623
|
| Total | $19,623 |
Amounts may not be complete
Worksite Name | | Property Name | Landowner Type |
Niepoth (#1)
|
|
Property 1 - Property - Worksite #1
|
Private
|
| | | Total |
Amounts may not be complete
| Category / Work Type / Metric | Final |
Restoration Metrics (rolled up from Worksite level) |
Fish Passage Improvement |
Fish passage blockages removed or altered (C.2.c.1) |
|
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
|
1
|
Culvert installed or improved (C.2.f.1) |
|
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
|
0.94
|
|
|
Number of blockages / impediments / barriers impeding passage (C.2.b.4)
|
1
|
Permit Type | Applied Date | Received Date | Expiration Date | Permit Number |
Forest Practices Application [Forest & Fish]
|
|
|
|
|
Hydraulics Project Approval [HPA]
|
|
|
|
|
Milestone Name | Target Date | Description |
Project Start
|
12/01/2005
|
|
30% Design Review/Cost Check
|
06/21/2006
|
|
Applied for Permits
|
08/01/2006
|
|
Bid Awarded/Contractor Hired
|
08/15/2006
|
|
Construction Started
|
09/01/2006
|
|
Construction Complete
|
09/15/2006
|
|
Annual Project Billing Due
|
07/15/2007
|
|
Agreement End Date
|
12/31/2007
|
|
Final Docs/Billing to Mgmt Agy
|
02/29/2008
|
|