Skip to main content
Save as PDF
Washington State Recreation and Conservation Office
Project Snapshot
PRISM Project #08-2185 (Completed)
Below the Keystone Bridge - Div. Screen/Bypass
    Project Details    
Cascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

04/06/2011, Attachment #131154, New Diversion Inlet
Cascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185) 04/06/2011, Attachment #131154, New Diversion Inlet

Cascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

04/06/2011, Attachment #131154, New Diversion Inlet Cascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

06/06/2008, Attachment #130923, Pre-project irrigation settling basinCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130924, Settling basin removalCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130925, Settling basin slab pourCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130926, Settling basin wall pourCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130927, Pump sump formsCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130928, Sump and basin forms strippedCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130929, Basin and sump backfilledCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130930, New fish screen detailCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130931, Fish bypass trenchCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130932, Fish bypass trench lower endCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130933, Fish bypass pipe outfallCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130934, Installing headgateCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130935, Installing slide gate for fish bypassCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130936, Electrical trenchCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130937, New pump installCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130938, Piping connection to old pumpCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130939, Pumps installedCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130940, PUD setting new poleCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130941, New transformersCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

Attachment #130942, Basin fillingCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

04/06/2011, Attachment #131155, New Diversion Inlet with Mike and KurtCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

04/06/2011, Attachment #131156, New Diversion CanalCascadia Conservation District; Below the Keystone Bridge - Div. Screen/Bypass (#08-2185)

04/06/2011, Attachment #131157, New Water Intake
Project Status:  Closed Completed since 01/10/2012
 
Project Type:  Restoration
Project Sponsor:  Cascadia Conservation District
Funding Board:  Salmon Recovery Funding Board
              Funding  
Salmon Federal Projects: $45,364
Total RCO Grant: $45,364 (67%)
Sponsor Match: $22,375 (33%)
Total Agreement: $67,739 (100%)
              Links
 

    Project Description    
The project will upgrade the existing Keystone Diversion and improve Entiat River salmon habitat diversity by replacing an instream push up dam that is reconstructed each year with a rock wing dam that directs water into a sluiceway. The rock structure will also serve as a grade control and create a large scour pool. Large woody debris will be added in the Entiat river to increase habitat diversity (pools/cover) for juvenile and adult salmonids in the form of two LWD structures comprised of five logs each and one ELJ constructed of about 30 logs. Five boulder cluster structures comprised of five four foot diameter boulders each will also be placed instream. The wing dam, LWD structures, ELJ, and boulder clusters will significantly improve habitat diversity (main limiting factor on lower Entiat River). The diversion fish screen and bypass on the diversion will be upgraded to comply with ESA standards to ensure safe juvenile salmonid passage.

Native trees and shrubs will be planted and underplanted in the riparian area (conifers, deciduous trees/livestakes, and shrubs) will be planted in the floodplain riparian area to enhance the existing riparian zone and also to establish a long-term source of LWD to the Entiat River. Enhanced riparian vegetation will also help moderate the high and low stream water temperatures that adversely affect juvenile salmonids. The project is located on the right and left banks of the Entiat River between RM 1.0 and RM 1.45.

    Project Contacts    
         
Project Sponsor: Cascadia Conservation District Lead Entity: Upper Columbia Salmon Recovery Board Lead Entity
  Project Contact: Kurt Hosman

(509) 436-1601
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Amee Bahr
Amee.Bahr@rco.wa.gov
(360) 867-8585
   

    Project Location    
General Area:   Near Keystone in Lower Entiat River
Waterbody:   Columbia River, Entiat River
County:   Chelan
Legislative District:   12
Congressional District 2022:   08
Salmon Recovery Regions:   Upper Columbia River
Watershed Administrative Unit:   Lower Entiat
HUC8:   Upper Columbia-Entiat (17020010)
WRIA:   Entiat
Sections:   18
Township:   T25NR21E
Coordinates:   47.66365727
-120.24458752

    Worksites    
Worksite NameScope of WorkActual Restoration Cost
diversion screen and bypass reconstruct (#1) Architectural & Engineering (A&E), Fish screens installed (C.1.c.1), Irrigation practice improvement (C.3.e.1) $67,739
 Total$67,739
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
diversion screen and bypass reconstruct (#1)   Property 1 - Keystone Ranch Private
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

Fish Screening Project
      Fish screens installed (C.1.c.1)
Number Of Fish Screens Installed (C.1.c.2) 1

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 01/15/2009
A&E Plans Submitted 02/01/2009
Applied for Permits 02/15/2009
RFP Complete 05/15/2009
Monitor/Steward Plan Submitted 05/15/2009
Bid Awarded/Consultant Hired 06/01/2009
Cultural Resources Complete 07/01/2009 Compliance with EO 05-05must be met prior to commencing construction
Construction Started 07/01/2009 May begin in 2010 depending on landowner MOU and permit windows
Progress Report Due 07/31/2009 Due with each annual billing
Annual Project Billing Due 07/31/2009 Due to the delay in setting up this contract, the sponsor may need more time to submit their first annual billing
Annual Project Billing Due 07/31/2010
Annual Project Billing Due 07/31/2011
Construction Complete 12/31/2011
Agreement End Date 01/31/2012
Final Docs/Billing to Mgmt Agy 03/31/2012


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Agreement - State Agreement.pdf 08/11/2009
Certification of Applicant Match 091708 CCD Below the Bridge Match.pdf 09/17/2008
Certification of Applicant Match USFS Match Form.pdf 08/08/2008
Certification of Applicant Match BOR Match Form.pdf 08/08/2008
Correspondence notice to proceed 05-05.pdf 08/18/2009
Correspondence 101608 Below The Bridge SRFB POC Response V3.pdf 11/14/2008
Correspondence 080708 BTB Responses to Rating Committee Questions.pdf 11/06/2008
Correspondence Responses to SRFB RP & RTT Questions.pdf 08/08/2008
Correspondence Trib Fund Preproposal 06-2008.pdf 06/19/2008
Design document Final Design Report - Feb. 2009.pdf 03/31/2011
Design document AER Tech Memo Anchor 10-10-08.pdf 10/27/2008
Design document Attach 3 Milne Diversion Design.pdf 08/08/2008
Design document July 2008 USBOR Final Alter Eval Report.pdf 08/08/2008
Evaluation proposal SRFB Project Proposal.pdf 09/05/2008
Evaluation proposal Riparian Planting Plan Slide Show.pdf 09/03/2008
Evaluation proposal Project Area Planting Numbers & Summary.pdf 09/03/2008
Evaluation proposal Funding Request Summary.pdf 08/08/2008
Evaluation proposal 3-Year Project Budget.pdf 08/08/2008
Evaluation proposal Limit 8 Self Certif Form 08-04-08.pdf 08/08/2008
Evaluation proposal Table of Restoration Actions RM 0-16.pdf 08/08/2008
Evaluation proposal Project Tasks & Schedule.pdf 08/08/2008
Evaluation proposal Site Photos 08-07-08.pdf 08/08/2008
Final project report Final Report 01/10/2012.pdf 01/10/2012
Inspection Report Final Inspection Photos 04-06-11.pptx 01/04/2012
Landowner acknowledgement form WDFW Landowner Acknowledgement Form.pdf 08/08/2008
Landowner acknowledgement form Foreman Landowner Acknowledgement Form.pdf 08/07/2008
Map Vicinity Map.pdf 08/08/2008
Notice of Long-Term Obligations Cascadia Conservation District - Dec 2014.pdf 04/11/2018
Photo New Water Intake.jpg 01/04/2012
Photo New Diversion Canal.jpg 01/04/2012
Photo New Diversion Inlet with Mike and Kurt.jpg 01/04/2012
Photo New Diversion Inlet.jpg 01/04/2012
Photo Basin filling.jpg 12/27/2011
Photo New transformers.jpg 12/27/2011
Photo PUD setting new pole.jpg 12/27/2011
Photo Pumps installed.jpg 12/27/2011
Photo Piping connection to old pump.jpg 12/27/2011
Photo New pump install.jpg 12/27/2011
Photo Electrical trench.jpg 12/27/2011
Photo Installing slide gate for fish bypass.jpg 12/27/2011
Photo Installing headgate.jpg 12/27/2011
Photo Fish bypass pipe outfall.jpg 12/27/2011
Photo Fish bypass trench lower end.jpg 12/27/2011
Photo Fish bypass trench.jpg 12/27/2011
Photo New fish screen detail.jpg 12/27/2011
Photo Basin and sump backfilled.jpg 12/27/2011
Photo Sump and basin forms stripped.jpg 12/27/2011
Photo Pump sump forms.jpg 12/27/2011
Photo Settling basin wall pour.jpg 12/27/2011
Photo Settling basin slab pour.jpg 12/27/2011
Photo Settling basin removal.jpg 12/27/2011
Photo Pre-project irrigation settling basin.jpg 12/27/2011
Visuals Aerial Photo 3 Lower Entiat Project Status Map.pdf 08/08/2008
Visuals Aerial Photo 2 Riparian Planting Areas.pdf 08/08/2008
Visuals Aerial Photo 1 Conceptual Design.pdf 08/08/2008
Visuals Project Description.pdf 05/07/2008
Visuals Keystone Ranch Diversion Photo.pdf 05/07/2008

Back to top Date of last change: 10/15/2024