Skip to main content
Save as PDF
Washington State Recreation and Conservation Office
Project Snapshot
PRISM Project #08-2186 (Completed)
Below the Keystone Bridge - Riparian Planting
    Project Details    
Cascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

04/06/2011, Attachment #131194, Mike & Phylisha Caring
Cascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186) 04/06/2011, Attachment #131194, Mike & Phylisha Caring

Cascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

04/06/2011, Attachment #131194, Mike & Phylisha Caring Cascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

Attachment #129756, Keystone planting 1Cascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

08/19/2010, Attachment #129757, Keystone planting 2Cascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

Attachment #130059, 2010 growth on p. pineCascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

Attachment #130060, 2010 monitoring(1)Cascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

Attachment #130061, 2010 monitoring(2)Cascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

Attachment #130062, 2010 monitoring(3)Cascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

Attachment #130293, 2011 monitoring(2)Cascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

Attachment #130296, project signCascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

Attachment #130297, new rock diversion installationCascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

Attachment #130919, RCO site visit 10-09Cascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

04/06/2011, Attachment #131187, WDFW PlantingsCascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

04/06/2011, Attachment #131188, Plantings along Diversion CanalCascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

04/06/2011, Attachment #131189, Plantings on WDFWCascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

04/06/2011, Attachment #131190, Riparian Plantings at lower endCascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

04/06/2011, Attachment #131191, Planting SurvivalCascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

04/06/2011, Attachment #131193, CD Staff Planting a PineCascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

04/06/2011, Attachment #131195, Plantings & Ice FlowCascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

04/06/2011, Attachment #131196, Plantings near Keystone Sign & Smolt TrapCascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

04/06/2011, Attachment #131197, Road ROW Plantings?Cascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

04/06/2011, Attachment #131198, LB ELJ PlantingsCascadia Conservation District; Below the Keystone Bridge - Riparian Planting (#08-2186)

04/06/2011, Attachment #131199, Recycling Plant Protectors
Project Status:  Closed Completed since 02/14/2012
 
Project Type:  Restoration
Project Sponsor:  Cascadia Conservation District
Funding Board:  Salmon Recovery Funding Board
              Funding  
Salmon Federal Projects: $18,848
Total RCO Grant: $18,848 (38%)
Sponsor Match: $31,274 (62%)
Total Agreement: $50,122 (100%)
              Links
 

    Project Description    
The project will upgrade the existing Keystone Diversion and improve Entiat River salmon habitat diversity by replacing an instream push up dam that is reconstructed each year with a rock wing dam that directs water into a sluiceway. The rock structure will also serve as a grade control and create a large scour pool. Large woody debris will be added in the Entiat river to increase habitat diversity (pools/cover) for juvenile and adult salmonids in the form of two LWD structures comprised of five logs each and one ELJ constructed of about 30 logs. Five boulder cluster structures comprised of five four foot diameter boulders each will also be placed instream. The wing dam, LWD structures, ELJ, and boulder clusters will significantly improve habitat diversity (main limiting factor on lower Entiat River). The diversion fish screen and bypass on the diversion will be upgraded to comply with ESA standards to ensure safe juvenile salmonid passage.

Native trees and shrubs will be planted and underplanted in the riparian area (conifers, deciduous trees/livestakes, and shrubs) will be planted in the floodplain riparian area to enhance the existing riparian zone and also to establish a long-term source of LWD to the Entiat River. Enhanced riparian vegetation will also help moderate the high and low stream water temperatures that adversely affect juvenile salmonids. The project is located on the right and left banks of the Entiat River between RM 1.0 and RM 1.45.

    Project Contacts    
         
Project Sponsor: Cascadia Conservation District Lead Entity: Upper Columbia Salmon Recovery Board Lead Entity
  Project Contact: Mike Rickel

(509) 436-1601
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Amee Bahr
Amee.Bahr@rco.wa.gov
(360) 867-8585
   

    Project Location    
General Area:   Near Keystone in Lower Entiat River
Waterbody:   Columbia River, Entiat River
County:   Chelan
Legislative District:   12
Congressional District 2022:   08
Salmon Recovery Regions:   Upper Columbia River
Watershed Administrative Unit:   Lower Entiat
HUC8:   Upper Columbia-Entiat (17020010)
WRIA:   Entiat
Sections:   18
Township:   T25NR21E
Coordinates:   47.66343195
-120.24536967

    Worksites    
Worksite NameScope of WorkActual Restoration Cost
Riparian Planting and Maintenance (#1) Architectural & Engineering (A&E), Channel structure placement (C.4.d.1), Other restoration activities, Planting (C.5.c.1), Riparian Plant removal / control (C.5.h.1) $50,122
 Total$50,122
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Riparian Planting and Maintenance (#1)   Property 1 - Keystone Ranch Private
Riparian Planting and Maintenance (#1)   Property 2 - WDFW State Government
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

Instream Habitat Project
      Channel structure placement (C.4.d.1)
Miles of Stream Treated for channel structure placement (C.4.d.3) 0.05
Pools Created through channel structure placement (C.4.d.5) 6
Number of structures placed in channel (C.4.d.7) 10

Riparian Habitat Project
      Planting (C.5.c.1)
Acres Planted in riparian (C.5.c.3) 5.5

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 01/15/2009
A&E Plans Submitted 02/01/2009
Applied for Permits 02/15/2009
RFP Complete 05/01/2009
Monitor/Steward Plan Submitted 05/15/2009
Bid Awarded/Consultant Hired 06/01/2009
Cultural Resources Complete 07/01/2009 Compliance with EO 05-05 must be met prior to commencing construction
Construction Started 07/01/2009 may begin in 2010 depending on landowner MOU and permit windows
Progress Report Due 07/31/2009
Annual Project Billing Due 07/31/2009 Due to the delay in setting up this contract, the sponsor may need more time to submit their annual billing
Annual Project Billing Due 07/31/2010
Annual Project Billing Due 07/31/2011
Construction Complete 12/31/2011 planting maintenance complete
Agreement End Date 01/31/2012
Final Docs/Billing to Mgmt Agy 03/31/2012


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Agreement - State Agreement.pdf 08/11/2009
Certification of Applicant Match 091708 CCD Below the Bridge Match.pdf 09/17/2008
Certification of Applicant Match USFS Match Form.pdf 08/08/2008
Certification of Applicant Match BOR Match Form.pdf 08/08/2008
Correspondence notice to proceed 05-05.pdf 08/18/2009
Correspondence 101608 Below The Bridge SRFB POC Response V3.pdf 11/14/2008
Correspondence 080708 BTB Responses to Rating Committee Questions.pdf 11/06/2008
Correspondence Responses to SRFB RP & RTT Questions.pdf 08/08/2008
Correspondence Trib Fund Preproposal 06-2008.pdf 06/19/2008
Design document AER Tech Memo Anchor 10-10-08.pdf 10/27/2008
Design document Attach 3 Milne Diversion Design.pdf 08/08/2008
Design document July 2008 USBOR Final Alter Eval Report.pdf 08/08/2008
Evaluation proposal SRFB Project Proposal.pdf 09/05/2008
Evaluation proposal Riparian Planting Plan Slide Show.pdf 09/03/2008
Evaluation proposal Project Area Planting Numbers & Summary.pdf 09/03/2008
Evaluation proposal Funding Request Summary.pdf 08/08/2008
Evaluation proposal 3-Year Project Budget.pdf 08/08/2008
Evaluation proposal Limit 8 Self Certif Form 08-04-08.pdf 08/08/2008
Evaluation proposal Table of Restoration Actions RM 0-16.pdf 08/08/2008
Evaluation proposal Project Tasks & Schedule.pdf 08/08/2008
Evaluation proposal Site Photos 08-07-08.pdf 08/08/2008
Final project report Final Report 02/14/2012.pdf 02/14/2012
Final project report Final Report 01/10/2012.pdf 01/10/2012
Inspection Report Final Inspection Photos 04-06-11.pptx 01/04/2012
Landowner acknowledgement form WDFW Landowner Acknowledgement Form.pdf 08/08/2008
Landowner acknowledgement form Foreman Landowner Acknowledgement Form.pdf 08/07/2008
Map Aerial Photo 2 BTB Riparian Planting Areas.pdf 04/11/2011
Map Vicinity Map.pdf 08/08/2008
Notice of Long-Term Obligations Cascadia Conservation District - Dec 2014.pdf 04/11/2018
Photo Recycling Plant Protectors.jpg 01/04/2012
Photo LB ELJ Plantings.jpg 01/04/2012
Photo Road ROW Plantings?.jpg 01/04/2012
Photo Plantings near Keystone Sign & Smolt Trap.jpg 01/04/2012
Photo Plantings & Ice Flow.jpg 01/04/2012
Photo Mike & Phylisha Caring.jpg 01/04/2012
Photo CD Staff Planting a Pine.jpg 01/04/2012
Photo Planting Survival.jpg 01/04/2012
Photo Riparian Plantings at lower end.jpg 01/04/2012
Photo Plantings on WDFW.jpg 01/04/2012
Photo Plantings along Diversion Canal.jpg 01/04/2012
Photo WDFW Plantings.jpg 01/04/2012
Photo RCO site visit 10-09.jpg 12/27/2011
Photo new rock diversion installation.jpg 12/15/2011
Photo project sign.jpg 12/15/2011
Photo 2011 monitoring(2).jpg 12/15/2011
Photo 2010 monitoring(3).jpg 12/09/2011
Photo 2010 monitoring(2).jpg 12/09/2011
Photo 2010 monitoring(1).jpg 12/09/2011
Photo 2010 growth on p. pine.jpg 12/09/2011
Photo Keystone planting 2.jpg 12/02/2011
Photo Keystone planting 1.jpg 12/02/2011
Visuals 2011 monitoring (3).pdf 12/15/2011
Visuals 2011 monitoring(1).pdf 12/15/2011
Visuals Aerial Photo 3 Lower Entiat Project Status Map.pdf 08/08/2008
Visuals Aerial Photo 2 Riparian Planting Areas.pdf 08/08/2008
Visuals Aerial Photo 1 Conceptual Design.pdf 08/08/2008
Visuals Project Description.pdf 05/07/2008
Visuals Keystone Ranch Diversion Photo.pdf 05/07/2008

Back to top Date of last change: 04/16/2024