Skip to main content
Save as PDF
Top Navigation
About PRISM and Project Search
Project Snapshot
PRISM Project #10-1701 (Completed)
Foster- Ruby Creek R8
Collapse All
Project Details
Kitsap Conservation District; Foster- Ruby Creek R8 (#10-1701) 06/03/2010, Attachment #99830, Foster_Outlet
Project Status:
 
Closed Completed since 02/17/2015
Project Type:
 
Restoration
Project Sponsor:
 
Kitsap Conservation District
Funding Board:
 
Recreation and Conservation Office
    Funding
 
FFFPP Grants:
$138,667
Total RCO Grant:
$138,667
(100%)
Total Agreement:
$138,667
(100%)
    Links
 
Original Project Agreement
Amendments: 1
Final Report
Attachments: 52 files
Project Description
These high priority fish passage barriers are locatedon Ruby Creek, a tributary to Blackjack Creek,where the stream crosses aprivate roadway near the end of Harper Rd. The Kitsap Conservation Districtwillsponsor the project and facilitateremoval ofthe existing 2 foot round precast concrete culverts and replacethem with a larger fish passable structure. One of the existing culverts has excessive slope and a hydraulic drop at the outlet, and both culverts are undersized. Correction of these two barriers would improve access to2.3 miles of habitat for coho, steelhead, cutthroat and possibly chum. Excellent habitat upstream.
Project Contacts
Project Sponsor:
Kitsap Conservation District
Lead Entity:
West Sound Partners for Ecosystem Recovery
Project Contact:
Carin Anderson
c-ander@kitsapcd.org
(360) 204-5529 Ext 122
Funding Agency:
Recreation and Conservation Office
Project Manager:
Sandy Dotts
sandra.dotts@rco.wa.gov
(360) 628-9487
Project Location
General Area:
Kitsap County
Waterbody:
Blackjack Creek, Ruby Creek
County:
Kitsap
Legislative District:
26
Congressional District 2022:
06
Salmon Recovery Regions:
Puget Sound
Watershed Administrative Unit:
S Sinclair Inlet
HUC8:
Puget Sound (17110019)
WRIA:
Kitsap
Sections:
10
Township:
T23NR01E
Coordinates:
47.50010195
-122.66600873
Worksites
Worksite Name
Scope of Work
Actual Restoration Cost
Foster - Ruby Cr fish barrier (#1)
Architectural & Engineering (A&E), Culvert installed or improved (C.2.f.1), Obtain permits
$138,667
Total
$138,667
Amounts may not be complete
Properties
Worksite Name
Property Name
Landowner Type
Foster - Ruby Cr fish barrier (#1)
Property 1 - Foster
Private
Total
Amounts may not be complete
Project Metrics (Outcomes, Benefits)
Category / Work Type / Metric
Final
Restoration Metrics (rolled up from Worksite level)
Permits
Obtain permits
Number of permits required for implementation of project
2
Fish Passage Improvement
Culvert installed or improved (C.2.f.1)
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
2.30
Number of culverts (C.2.f.2)
1
Number of blockages / impediments / barriers impeding passage (C.2.b.4)
2
Project Milestones
Milestone Name
Target Date
Description
Project Start
09/01/2013
Preliminary Design to RCO
03/28/2014
Landowner Agreement to RCO
04/05/2014
Applied for Permits
04/15/2014
Final Design to RCO
04/30/2014
Permits Complete
05/15/2014
Progress Report Due
05/16/2014
Bid Awarded/Contractor Hired
05/31/2014
Cultural Resources Complete
06/30/2014
Annual Project Billing Due
07/31/2014
Restoration Started
08/01/2014
Restoration Complete
09/30/2014
Progress Report Due
10/15/2014
RCO Final Inspection
12/24/2014
Agreement End Date
01/31/2015
Final Report Due
02/28/2015
Final Billing Due
02/28/2015
Project Attachments
Attachment Type
Attachment Title
Attach Date
Agreement - State
10-1701 Project Agreement.pdf
04/15/2014
Amendment - State
10-1701 Amend #1 Cost Change.pdf
07/22/2014
Application Review Report
Application Review Report, 10-1701R(compl 03/25/14 15:42:31).pdf
03/25/2014
Barrier evaluation form
Foster_RubyCr_BEF_.doc
06/01/2010
Correspondence
Foster FFFPP milestone.doc
03/06/2014
Correspondence
FFFPP Transmital with email.pdf
06/13/2013
Correspondence
Welcome Letter BEF Not completed.doc
05/12/2010
Correspondence
Tracking Form Revised.doc
04/30/2010
Correspondence
Directions.pdf
04/30/2010
Final design
Final Design.pdf
08/15/2014
Final project report
Final Report 02/17/2015.pdf
02/17/2015
Landowner application
fp2416941.pdf
10/10/2014
Landowner application
Application.pdf
04/30/2010
Map: Site Location
FosterParcelMap.pdf
04/12/2011
Photo
Foster_RubyCr_Rd_1.JPG.jpg
05/23/2022
Photo
Foster_RubyCr_Outlet_5.JPG.jpg
05/23/2022
Photo
Foster_RubyCr_Outlet_3.JPG.jpg
05/23/2022
Photo
Foster_RubyCr_Outlet_2.JPG.jpg
05/23/2022
Photo
Foster_RubyCr_Outlet_1.JPG.jpg
05/23/2022
Photo
Foster_RubyCr_Inlet_2.JPG.jpg
05/23/2022
Photo
Foster_RubyCr_Inlet_1.JPG.jpg
05/23/2022
Photo
Foster_RubyCr_DS_1.JPG.jpg
05/23/2022
Photo
Culvert Outlet#2.jpg
02/11/2015
Photo
Culvert Outlet.jpg
02/11/2015
Photo
Culvert Inlet#2.jpg
02/11/2015
Photo
Culvert Inlet.jpg
02/11/2015
Photo
DS Channel.jpg
02/11/2015
Photo
US Channel.jpg
02/11/2015
Photo
Finished Crossing.jpg
02/11/2015
Photo
20140904_142803.jpg
10/08/2014
Photo
20140909_152139.jpg
10/08/2014
Photo
20140902_121935.jpg
10/08/2014
Photo
20140902_143816.jpg
10/08/2014
Photo
20140910_093052.jpg
10/08/2014
Photo
20140902_152355.jpg
10/08/2014
Photo
20140912_120624.jpg
10/08/2014
Photo
20140912_120415.jpg
10/08/2014
Photo
20140904_133743.jpg
10/08/2014
Photo
20140829_092859.jpg
10/08/2014
Photo
20140827_124843.jpg
10/08/2014
Photo
20140825_111339.jpg
10/08/2014
Photo
Footings 2.jpg
09/04/2014
Photo
Footings.jpg
09/04/2014
Photo
Foster_James_US.jpg
07/02/2010
Photo
Foster_James_Rd.jpg
07/02/2010
Photo
Foster_DS.jpg
07/02/2010
Photo
Foster_Inlet1.jpg
07/02/2010
Photo
Foster_Outlet.jpg
07/02/2010
Progress report
Progress Report 09/12/2014.pdf
09/12/2014
Project Application Report
Application Report, 10-1701R (submitted 03/25/14 15:40:13).pdf
03/25/2014
Site map WDFW
10-1701_FosterJames_Habitat_TopoMap.pdf
04/07/2011
Site map WDFW
10-1701_FosterJames_Habitat_OrthoMap.pdf
04/07/2011
Back to top
Date of last change: 06/05/2023