Project Snapshot
PRISM Project #10-1843 (Completed)
Dillwater LWD Enhancement
    Project Details    
Chelan Co Natural Resource; Dillwater LWD Enhancement (#10-1843)

09/28/2012, Attachment #152924, 2012 Mckenzie-Dillwater 005
Chelan Co Natural Resource; Dillwater LWD Enhancement (#10-1843) 09/28/2012, Attachment #152924, 2012 Mckenzie-Dillwater 005

Chelan Co Natural Resource; Dillwater LWD Enhancement (#10-1843)

09/28/2012, Attachment #152924, 2012 Mckenzie-Dillwater 005 Chelan Co Natural Resource; Dillwater LWD Enhancement (#10-1843)

Attachment #114413, Dillwater Conceptual Design 01-31-11Chelan Co Natural Resource; Dillwater LWD Enhancement (#10-1843)

09/28/2012, Attachment #152922, ELJ_1_pilingsChelan Co Natural Resource; Dillwater LWD Enhancement (#10-1843)

09/28/2012, Attachment #152923, ELJ_5_completed
Project Status:  Closed Completed since 08/27/2014
 
Project Type:  Restoration
Project Sponsor:  Chelan County Natural Resources Department
Funding Board:  Salmon Recovery Funding Board
              Funding  
Salmon Federal Projects: $159,385
Total RCO Grant: $159,385 (46%)
Sponsor Match: $186,498 (54%)
Total Agreement: $345,884 (100%)
              Links
 

    Project Description    
The Dillwater LWD Enhancement project, located between River Mile 21.2 and 21.4 on the Entiat River, aims to improve habitat complexity by construction of 4-5 Engineered Log Jams (ELJs) in the main channel and along the banks. This project is located in the “Stillwater Reach” which will be intensively monitored for fish response to restoration activities by the ISEMP Program in 2011. The upper sub-basin is considered a Category 1 Watershed and is also a critical spawning area for Federally Endangered spring Chinook, Threatened Upper Columbia River steelhead, and Threatened bull trout. This project would have direct benefits to a 1/3-mile reach on the mainstem, improve habitat conditions in a 1,100 ft side-channel, and affect approximately 13 acres of connected riparian floodplain. The USBR Preston Reach Assessment recommends the addition of large woody debris in this reach as a habitat improvement action and the REI indicates an “at risk” condition for this habitat element. The Dillwater ELJ structures are intended to create habitat by adding stream channel complexity elements, particularly for juvenile fishes, and to afford high-flow refugia. In addition, they would be effective at sediment storage which is needed to reduce lateral stream channel instability. USFWS data shows that a high local sediment supply (from upstream bank erosion), coupled with high width-to-depth ratios, has resulted in an enlarging channel and instability is exaserbated by limited riparian vegetation upstream.

    Project Contacts    
         
Project Sponsor: Chelan County Natural Resources Department Lead Entity: Upper Columbia Salmon Recovery Board Lead Entity
  Project Contact: Mike Kane
mike.kane@co.chelan.wa.us
(509) 885-2126
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Amee Bahr
Amee.Bahr@rco.wa.gov
(360) 867-8585
   

    Project Location    
General Area:   Chelan County
County:   Chelan
Legislative District:   12
Congressional District 2022:   08
Salmon Recovery Regions:   Upper Columbia River
Watershed Administrative Unit:   Middle Entiat
HUC8:   Upper Columbia-Entiat (17020010)
WRIA:   Entiat
Sections:   11
Township:   T27NR19E
Coordinates:   47.85985367
-120.42286590

    Worksites    
Worksite NameScope of WorkActual Restoration Cost
CDLT Property (#1) Architectural & Engineering (A&E), Channel structure placement (C.4.d.1), Cultural resources, Obtain permits, Planting (C.5.c.1) $345,884
 Total$345,884
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
CDLT Property (#1)   Property 1 - CDLT Dill Creek Property Private
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

Instream Habitat Project
      Channel structure placement (C.4.d.1)
Miles of Stream Treated for channel structure placement (C.4.d.3) 0.30
Acres Of Streambed Treated for channel structure placement (C.4.d.4) 2.3
Pools Created through channel structure placement (C.4.d.5) 5
Number of structures placed in channel (C.4.d.7) 5

Riparian Habitat Project
      Planting (C.5.c.1)
Acres Planted in riparian (C.5.c.3) 1.5

Permits
      Obtain permits
Number of permits required for implementation of project 3

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 12/10/2010
Applied for Permits 03/31/2011
Preliminary Design to RCO 05/13/2011
Annual Project Billing Due 07/31/2011
Progress Report Due 07/31/2011
Landowner Agreement to RCO 08/01/2011
Bid Awarded/Contractor Hired 08/15/2011
Final Design to RCO 08/31/2011
Progress Report Due 12/31/2011
Cultural Resources Complete 06/29/2012
Permits Complete 07/16/2012
Restoration Started 07/16/2012
Annual Project Billing Due 07/31/2012
Progress Report Due 07/31/2012
Restoration Complete 12/31/2012
Progress Report Due 12/31/2012
Annual Project Billing Due 07/31/2013
Progress Report Due 07/31/2013
Final Report Due 12/31/2013
RCO Final Inspection 12/31/2013
Agreement End Date 12/31/2013
Final Billing Due 03/31/2014


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Agreement - State Agreement.pdf 04/04/2011
Amendment - State 10-1843 Amend #1 Cost Change.pdf 08/12/2014
Correspondence Dill Creek Restore Approv 03-25-11.pdf 03/25/2011
Correspondence Tribal Formal Consultaion 2010.pdf 03/22/2011
Correspondence DAHP 2010 Cultural Resources Letter.pdf 01/12/2011
Correspondence Cultural Resources 2010 Exemption List.pdf 01/12/2011
Correspondence BPA Match Funding Letter 10-5-10.pdf 10/08/2010
Design document Dillwater_Design_plans_06_2_11.pdf 07/14/2011
Design document Dillwater Conceptual Design 01-31-11.jpg 03/25/2011
Final project report Final Report 08/27/2014.pdf 08/27/2014
Inspection Report Interim Inspection Photos 11-15-12.pptx 02/05/2013
Map Vicinity Map.pdf 06/04/2010
Monitoring activity Dillwater_monitoring_2013_pdf.pdf 07/25/2014
Notice of Long-Term Obligations Chelan County - July 1, 2016.pdf 07/01/2016
Photo ELJ4_riffle_dev.jpg 08/20/2013
Photo ELJ1_quiet_water_at_pilings.jpg 08/20/2013
Photo ELJ1_new_rack.jpg 08/20/2013
Photo ELJ1_lk_upstream.jpg 08/20/2013
Photo ELJ5.jpg 08/20/2013
Photo ELJ1_lk_downstream_and_riffle_dev.jpg 08/20/2013
Photo ELJ4_racked_material_tip_scour_riffle_dev.jpg 08/20/2013
Photo ELJ4_lk_upstream.jpg 08/20/2013
Photo ELJ3_mostly_submerged_in_sidech.jpg 08/20/2013
Photo ELJ2_look_at_all_that_new_racked_material!.jpg 08/20/2013
Photo ELJ2_flow_deflection_lots_of_submerged_habitat_at_all_flows.jpg 08/20/2013
Photo ELJ1_racked_mat_energy_diss_and_depositional_island_in_lee.jpg 08/20/2013
Photo ELJ1.jpg 08/20/2013
Photo Jam #1 in foreground & Jam #2 in background.jpg 02/05/2013
Photo ELJ #2.jpg 02/05/2013
Photo Jam #3 looking upstream.jpg 02/05/2013
Photo ELJ #3.jpg 02/05/2013
Photo Upstream Jam #4.jpg 02/05/2013
Photo Upstream ELJ #4.jpg 02/05/2013
Photo 2012 Mckenzie-Dillwater 005.jpg 10/01/2012
Photo ELJ_5_completed.jpg 10/01/2012
Photo ELJ_1_pilings.jpg 10/01/2012
Progress report Progress Report 01/11/2012.pdf 01/11/2012
Salmon Project Proposal Final Project Proposal.pdf 08/20/2010
Site Plan: Restoration Site Plan DillCreekMeadow_Re-Veg_2013.pdf 07/25/2014
SRFB Review Panel Comment Form Response SRFB comments 10-1843 Dillwater ELJs.pdf 11/29/2010
SRFB Review Panel Comment Form Final SRFB RP Comment Form.pdf 11/29/2010

Back to top Date of last change: 08/09/2024