Skip to main content
Save as PDF
Washington State Recreation and Conservation Office
Project Snapshot
PRISM Project #11-1185 (Completed)
Jurges- Enetai Creek R9
    Project Details    
Mason Conservation Dist; Jurges- Enetai Creek R9 (#11-1185)

02/06/2013, Attachment #158316, Outlet Middle Crossing
Mason Conservation Dist; Jurges- Enetai Creek R9 (#11-1185) 02/06/2013, Attachment #158316, Outlet Middle Crossing

Mason Conservation Dist; Jurges- Enetai Creek R9 (#11-1185)

02/06/2013, Attachment #158316, Outlet Middle Crossing
Project Status:  Closed Completed since 04/23/2015
 
Project Type:  Restoration
Project Sponsor:  Mason County Conservation District
Funding Board:  Recreation and Conservation Office
              Funding  
FFFPP Grants: $413,457
Total RCO Grant: $413,457 (100%)
Total Agreement: $413,457 (100%)
              Links
 

    Project Description    
The Mason Conservation District will replace the three Jurges culverts that are on Enetai Creek, a tributary to Puget Sound near Bremerton. The three culverts that are currently there are all barriers to fish passage and will be replaced, the lower most site will be replaced with a 36' by 14' concrete bridge, the next crossing will be replaced with a 40' by 14' steel bridge and the uppermost site will be replaced with a 16'4" wide by 5'11" high aluminum box culvert. Correction of all 3 barrier culverts would improve access to 0.67 miles of habitat to the next upstream total barrier at Trenton Ave. Habitat quality is very good at the Jurges site almost up to the Trenton road culvert where the channel is scoured to hardpan for about 100ft downstream.

    Project Contacts    
         
Project Sponsor: Mason County Conservation District Lead Entity: West Sound Partners for Ecosystem Recovery
  Project Contact: Gavin Glore
gavin.glore@graysharborcd.org
(360) 249-8532
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Sandy Dotts
sandra.dotts@rco.wa.gov
(360) 628-9487
   

    Project Location    
General Area:   Bremerton, Kitsap County
Waterbody:   Enetai Creek, Puget Sound
County:   Kitsap
Legislative District:   23
Congressional District 2022:   06
Salmon Recovery Regions:   Puget Sound
Watershed Administrative Unit:   Dyes Inlet
HUC8:   Puget Sound (17110019)
WRIA:   Kitsap
Sections:   07
Township:   T24NR02E
Coordinates:   47.57913160
-122.60146981

    Worksites    
Worksite NameScope of WorkActual Restoration Cost
Jurges fish barriers (#1) Architectural & Engineering (A&E), Bridge installed or improved (C.2.g.1), Culvert installed or improved (C.2.f.1) $413,457
 Total$413,457
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Jurges fish barriers (#1)   Property 1 - Jurges Private
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

Fish Passage Improvement
      Culvert installed or improved (C.2.f.1)
Miles of stream made accessible by culvert installation/repair (C.2.f.3) 0.52
      Bridge installed or improved (C.2.g.1)
Miles of stream made accessible by bridge installation/repair (C.2.g.3) 0.15
      Culvert installed or improved (C.2.f.1)
Number of culverts (C.2.f.2) 1
      Bridge installed or improved (C.2.g.1)
Number of bridges (C.2.g.2) 2
      
Number of blockages / impediments / barriers impeding passage (C.2.b.4) 3

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 05/31/2012
Preliminary Design to RCO 03/25/2013
Applied for Permits 04/22/2013
Cultural Resources Complete 06/01/2013 Completed by RCO
Progress Report Due 06/17/2013
Final Design to RCO 06/24/2013 Prior to construction
Permits Complete 06/24/2013
Bid Awarded/Contractor Hired 06/27/2013
Landowner Agreement to RCO 07/01/2013 Prior to construction
Restoration Started 07/15/2013
Annual Project Billing Due 07/31/2013
Progress Report Due 10/31/2013
Progress Report Due 05/19/2014
Annual Project Billing Due 07/31/2014
Restoration Complete 09/30/2014
RCO Final Inspection 11/30/2014
Agreement End Date 01/12/2015
Special Conditions Met 02/12/2015 As-builts as necessary
Final Report Due 02/28/2015
Final Billing Due 02/28/2015


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Agreement - State Agreement.pdf 04/04/2013
Amendment - State 11-1185 Amend #1 Time Extension.pdf 04/30/2015
Amendment - State 11-1185 Amend #3 Time Extension.pdf 12/16/2014
Amendment - State 11-1185 Amend #2 Cost Change.pdf 06/20/2014
Barrier evaluation form Jurges_Site_C_BEF_.doc 07/21/2011
Barrier evaluation form Jurges_Site_B_BEF_.doc 07/21/2011
Barrier evaluation form Jurges_Site_A_BEF_.doc 07/21/2011
Billing Audit RCO Jurges 11-1185 #10 Jul 2014 (2).pdf 08/04/2014
Correspondence Welcome Letter.doc 02/17/2011
Correspondence Background corespondance.pdf 02/17/2011
Correspondence Directions.pdf 02/17/2011
Final design Jurges FFFPP 2014 Design Drawings, As-built.pdf 01/15/2015
Final design Jurges FFFPP 2013 Design Drawings Final.pdf 01/15/2015
Final design Jurges Aluminum Box - Approved Shop Drawings.pdf 08/29/2014
Final project report Final Report 04/23/2015.pdf 04/23/2015
Landowner application Application.pdf 02/17/2011
Map Ortho w culvert locations.pdf 02/17/2011
Photo Site C Outlet.jpg 04/22/2015
Photo Site C Inlet.jpg 04/22/2015
Photo Site C Completed.jpg 04/22/2015
Photo Site B US of Bridge.jpg 04/22/2015
Photo Site B DS of Bridge.jpg 04/22/2015
Photo Site B Completed.jpg 04/22/2015
Photo Site A US of Bridge.jpg 04/22/2015
Photo Site A DS of Bridge.jpg 04/22/2015
Photo Site A Completed.jpg 04/22/2015
Photo Jurges, uppersite, finished road, compressed.jpg 12/20/2013
Photo Jurges, uppersite, finished outlet, compressed.jpg 12/20/2013
Photo jurges, upper site, finished inlet, compressed.jpg 12/20/2013
Photo Jurges, lower site, finished road 2, compressed.jpg 12/20/2013
Photo Jurges, lower site bridge, from upstream.jpg 12/20/2013
Photo Jurges, lower site bridge, from downstream.jpg 12/20/2013
Photo Outlet Lower Crossing.jpg 03/01/2013
Photo Outlet Upper Crossing.jpg 03/01/2013
Photo Outlet Middle Crossing.jpg 03/01/2013
Progress report Progress Report 07/29/2014.pdf 07/29/2014
Progress report Progress Report 12/26/2013.pdf 12/26/2013
Progress report Progress Report 07/15/2013.pdf 07/15/2013
Site map WDFW 11-1185_Jurges_Habitat_TopoMap.pdf 04/05/2011
Site map WDFW 11-1185_Jurges_Habitat_OrthoMap.pdf 04/05/2011
Visuals Jurges – Enetai Cr.ppt 04/05/2011

Back to top Date of last change: 08/08/2024