Entiat River - Gray to Stormy Reach Protection
Collapse All
Project Details
Chelan-Douglas Land Trust; Entiat River - Gray to Stormy Reach Protection (#11-1415) Attachment #180198, P1150080
Project Status:
 
Closed Completed since 05/04/2018
Project Type:
 
Acquisition
Project Sponsor:
 
Chelan-Douglas Land Trust
Funding Board:
 
Salmon Recovery Funding Board
    Funding
 
Salmon Federal Projects:
$492,841
Total RCO Grant:
$492,841
(83%)
Sponsor Match:
$100,912
(17%)
Total Agreement:
$593,754
(100%)
    Links
 
Original Project Agreement
Amendments: 14
Attachments: 124 files
Project Description
The Chelan-Douglas Land Trust seeks to acquire fee title to a 56 acre parcel (Tyee Confluence - NCNB) from a willing landowner at River Mile 19.7 -20.2 of the Entiat River, a tributary of the Columbia River. It is a Category 1 Watershed, designated as Key Watershed in the Northwest Forest Plan, and “is a critical habitat for spring Chinook salmon, steelhead and bulltrout” (Biological Strategy 2003). This reach (2C) has high complexity in an unconfined floodplain (Entiat Tributary Assessment, BOR Jan, 2009). The Stillwaters from RM 16-25 is first priority for land protection and acquisition, with “large pristine areas would be the highest priority.” (UCRTT, Feb. 2007)
The property includes the alluvial fan of Tyee Creek, which splits as it flows to the river, and feeds a network of off-channel habitat. The property includes 3,380 feet of riverbank, 1,690 feet on each side. According to the Bureau of Reclamation mapping, 78% of the site is within the floodplain, all of the channel migration zone on river right lies entirely within this property, and the property has natural accumulations of large woody debris (BOR 2009).
The project is amended to include SRFB grant #13-1288, funded December 4, 2013, to acquire four additional properties - Bockhoven North (16.51 acres), Crone (11.87 acres), Price (24.1 acres) and Bockhoven South (24.83 acres). These high priority habitat parcels are located in the Entiat Stillwaters-Gray Reach.
The project scope is amended to add the 6.5 acre Beutler property, as replacement habitat lands, for the 4 acres of Tyee Confluence (NCNB) upland acres that have been sold for private development. The SRFB deed of right will be released from said 4 acres, thus bringing the total habitat area on that property to 52 acres. The scope change/conversion of previously acquired SRFB lands was approved by RCO Director Kaleen Cottingham September 29, 2016.
The total targeted habitat area is 135.81 acres.
Project Contacts
Project Sponsor:
Chelan-Douglas Land Trust
Lead Entity:
Upper Columbia Salmon Recovery Board Lead Entity
Project Contact:
Mickey Fleming
mickey@cdlandtrust.org
(509) 667-9708
Funding Agency:
Recreation and Conservation Office
Project Manager:
Amee Bahr
Amee.Bahr@rco.wa.gov
(360) 867-8585
Project Location
General Area:
Upper Entiat
County:
Chelan
Legislative District:
12
Congressional District 2022:
08
Salmon Recovery Regions:
Upper Columbia River
Watershed Administrative Unit:
Stormy
HUC8:
Upper Columbia-Entiat (17020010)
WRIA:
Entiat
Sections:
14
Sections:
26
Sections:
27
Sections:
35
Township:
T27NR19E
Coordinates:
47.84152706
-120.41624167
Worksites
Worksite Name
Scope of Work
Stormy Reach Phase 2 (#1)
Administrative costs (Acq), Appraisal, Appraisal Review, Baseline Documentation, Closing, Recording, Taxes, Title, Demolition, Environmental Audits, Land, Signs (Acq), Standard Incidentals, Stewardship plan, Survey (Acq), Wetland Delineations
Amounts may not be complete
Properties
Worksite Name
Property Name
Actual Acquisition
Acres
Actual Acquisition
Cost
Stormy Reach Phase 2 (#1)
Property 1 - Private Landowner
47.85
$118,200
Stormy Reach Phase 2 (#1)
Property 2 - Private Landowner
0.00
$15,480
Stormy Reach Phase 2 (#1)
Property 3 - Private Landowner
8.50
$305,824
Stormy Reach Phase 2 (#1)
Property 4 - Private Landowner
24.83
$40,085
Stormy Reach Phase 2 (#1)
Property 5 - Private Landowner
0.00
$7,460
Stormy Reach Phase 2 (#1)
Property 6 - Private Landowner
6.50
$69,000
Stormy Reach Phase 2 (#1)
Property 7 - Private Landowner
6.50
$37,231
Stormy Reach Phase 2 (#1)
Property 8 - Private Landowner
0.00
$473
Total
94.18
$593,753
Amounts may not be complete
Project Metrics (Outcomes, Benefits)
Category / Work Type / Metric
Final
Acquisition Metrics (rolled up from Property level)
Real Property Acquisition
Land
Acres zoned as agricultural land
96000.00
Project Milestones
Milestone Name
Target Date
Description
Order Appraisal(s)
12/06/2011
Appraisal complete.
Project Start
12/08/2011
Order Appraisal Review(s)
02/15/2012
Purchase Agreement Signed
03/31/2012
Cultural Resources Complete
03/31/2012
Exempt from DAHP 05-05, no ground disturbing activities.
Environmental Assess Complete
04/20/2012
Acquisition Closing
04/30/2012
Recorded Acq Documents to RCO
05/31/2012
Progress Report Due
07/31/2012
Annual Project Billing Due
07/31/2012
Stewardship Plan to RCO
12/31/2012
Funding Acknowl Sign Posted
12/31/2012
Progress Report Due
12/31/2012
Annual Project Billing Due
07/31/2013
Progress Report Due
07/31/2013
Progress Report Due
01/31/2014
Annual Project Billing Due
07/31/2014
Progress Report Due
07/31/2014
Progress Report Due
05/31/2017
Annual Project Billing Due
07/31/2017
Progress Report Due
01/09/2018
Agreement End Date
03/15/2018
Final Report Due
03/31/2018
Final Billing Due
03/31/2018
Project Attachments
Attachment Type
Attachment Title
Attach Date
Agreement - State
11-1415 Project Agreement.pdf
03/30/2012
Amendment - State
11-1415 Amend #7 Add Worksite or Property.pdf
06/06/2018
Amendment - State
11-1415 Amend #4 Project name change.pdf
06/06/2018
Amendment - State
11-1415 Amend 3 Cost Change.pdf
06/06/2018
Amendment - State
11-1415 Amend #2 time Ext.pdf
06/06/2018
Amendment - State
11-1415 Amend #1 Scope Change.pdf
06/06/2018
Amendment - State
11-1415 Amend #14 Cost Change.pdf
03/28/2017
Amendment - State
11-1415 Amend #13 Add Worksite or Property.pdf
03/28/2017
Amendment - State
11-1415 Amend 15 Time Ext.pdf
03/21/2017
Amendment - State
11-1415 Amend #11 Scope Change.pdf
10/17/2016
Amendment - State
11-1415 Amend #9 Time Extensions.pdf
04/18/2016
Amendment - State
11-1415 Amend #8 Time Extension.pdf
10/13/2015
Amendment - State
11-1415 Amend #6 Time Extension.pdf
10/08/2014
Amendment - State
11-1415 Amend #5 Cost Change.pdf
07/07/2014
Amendment request
11-1415 Gray to Stormy Scope Change Request Draft.docx
03/06/2017
Certification of Applicant Match
2017 SP--CDLT (Cottonwood Bridge) letter.pdf
07/24/2017
Certification of Applicant Match
Buyer's grant funds receipt.pdf.pdf
05/16/2017
Certification of Applicant Match
Trib Com Match Approval 07.11.pdf
07/20/2011
Compliance Document
Entiat Conversion Visuals.pptx
06/16/2017
Compliance Document
RCO Troy Replacement Proposal Jan 2017.docx
06/16/2017
Conversion documents
Entiat Planning Unit Presentation March 2016.pptx
04/25/2016
Correspondence
Signed CDLT Restoration Approval 07-10-19.pdf
07/10/2019
Correspondence
Bockoven letter 5.22.17.pdf
06/21/2017
Correspondence
North Meridian Wire Instructions.pdf.pdf
05/16/2017
Correspondence
Response to Bockoven letter 11.17.16.doc
12/21/2016
Correspondence
Letter from Bockovens 09-30-16.pdf
11/16/2016
Correspondence
Bockoven South Just Compens 07-14-14.pdf
07/17/2014
Correspondence
Signed Just Compensation and Relocation.pdf
04/25/2012
Deed
Donaldson SWD 10.20.17.pdf
10/25/2017
Deed
Crone/Bock North Easement Termination.pdf
10/11/2017
Deed
AFN 2461929 Crone SWD 07-28-17.pdf
08/07/2017
Deed
Beutler SWD 10-14-16.pdf
11/16/2016
Deed
AFN 240444 Deed Bockoven to CDLT 7.31.14.pdf
08/26/2014
Deed
NCNB (Tyee Confl) SWD 04-18-12.pdf
04/25/2012
Deed of right
Donaldson DOR 11-21-17.pdf
11/21/2017
Deed of right
Crone Deed of Right 10-12-17.pdf
10/17/2017
Deed of right
Entiat Troy 09-1455 Partial_Release_Deed_of_Right_Template.doc
06/16/2017
Deed of right
Recorded Partial Release of DOR 10-14-16.pdf
03/08/2017
Deed of right
Beutler DOR 11-15-16.pdf
11/16/2016
Deed of right
Bockhoven South DOR 07-31-14.pdf
10/09/2014
Deed of right
NCNB (Tyee Confluence) DOR 04-27-12.pdf
04/30/2012
Design document
Stormy Reach ABD Concepts 10-07-14.pdf
10/22/2014
Design document
Stormy-Gray Reaches Map Book 7-18-14.pdf
10/22/2014
Easement
AFN2460151 Termination of Cottonwood BR Easement and Agreeme.pdf
06/29/2017
Easement
Insurable legal access.docx
07/15/2014
Environmental Assessment (EA)
Phase 1 ESA 02.25.12.pdf
03/06/2012
Environmental Audit
Bockhoven N & S Phase 1 Env Assess 07-04-14.pdf
07/14/2014
Environmental Site Assessment Report
CDLT - Entiat River Gray Reach Properties - Phase I ESA.pdf.pdf
06/21/2017
Environmental Site Assessment Report
Crone Property - Phase I ESA.pdf.pdf
05/22/2017
Environmental Site Assessment Report
CDLT - Entiat River Gray Reach Properties - Phase I ESA.pdf
05/02/2017
Environmental Site Assessment Report
Tyee Confluence (NCNB) Parcel Map.pdf
05/03/2011
Final project report
Final Report, 11-1415 (accepted 04/25/18 08:39:35).pdf
04/25/2018
Hazardous Substance Certification Form
Beutler Hazard Substances Certif 08-16-17.pdf
04/10/2018
Hazardous Substance Certification Form
Donaldson Hazard Subst Certi 08-16-17.pdf
08/16/2017
Hazardous Substance Certification Form
Crone Hazardous Subst Certifi 05-22-17.pdf
05/22/2017
Hazardous Substance Certification Form
Bockoven South Haz Sub Certif 07-14-14.pdf
07/14/2014
Hazardous Substance Certification Form
NCNB (Tyee Confl) Haz Subst Certif 04-12-12.pdf
04/12/2012
Inspection Photos
Cottonwood BR Removal Photos 09-2017.pptx
11/11/2017
Inspection Report
Inspection Report, #1077 (Accepted 02/21/18 08:36:22).pdf
02/21/2018
Inspection Report
9-19-17 Cottonwood BR Report.pdf
09/25/2017
Inspection Report
9-15-17 Cottonwood BR Report.pdf
09/19/2017
Inspection Report
09-11-17 Cottonwood BR Report.pdf
09/13/2017
Inspection Report
9-8-17 Cottonwood BR Report.pdf
09/13/2017
Inspection Report
09-05-17 Cottonwood BR Report.pdf
09/11/2017
Inspection Report
8-29-17 Cottonwood BR Report.pdf
09/05/2017
Inspection Report
Cottonwood Flats Bridge Inspection Memo 10-14-14.pdf
06/01/2017
Inspection Report
Inspection Report, #837 (Submitted 09/16/16 09:26:16).pdf
09/16/2016
Map
Tyee Confluence Maps & Orthos.pdf
10/14/2011
Map
Troy Property Maps & Orthos.pdf
10/14/2011
Map
Entiat Stillwaters Habitat Protection with Public Ownership.jpg
05/06/2011
Map: Multi-site and geographic envelope
Map of Gray Reach Acquisitions 2.17.pdf.pdf
02/14/2017
Map: Multi-site and geographic envelope
Gray Reach Acquisitions 2.17.pdf.pdf
02/14/2017
Map: Parcel map
Entiat Stillwaters Maps.pdf
06/06/2018
Map: Parcel map
Crone Parcel Map with Possible Resale Lot.pdf
10/08/2014
Photo
Closeup Scoville Replacement Property.jpg
12/21/2016
Photo
Scoville Replacement Property.jpg
12/21/2016
Photo
P1150079.jpg
03/17/2014
Photo
P1150077.jpg
03/17/2014
Photo
P1150075.jpg
03/17/2014
Photo
P1150074.jpg
03/17/2014
Photo
P1150073.jpg
03/17/2014
Photo
P1150088.jpg
03/17/2014
Photo
P1150085.jpg
03/17/2014
Photo
P1150084.jpg
03/17/2014
Photo
P1150082.jpg
03/17/2014
Photo
P1150081.jpg
03/17/2014
Photo
P1150080.jpg
03/17/2014
Photo
P1150071.jpg
03/17/2014
Photo
P1130853.jpg
08/19/2013
Photo
P1130854.jpg
08/19/2013
Photo
P1130849.jpg
08/19/2013
Photo
P1130848.jpg
08/19/2013
Photo
P1130847.jpg
08/19/2013
Photo
P1130857.jpg
08/19/2013
Photo
P1130856.jpg
08/19/2013
Photo
P1130845.jpg
08/19/2013
Photo
Photos_Page_2.jpg
08/08/2011
Photo
Photos_Page_1.jpg
08/08/2011
Progress report
Progress Report, 11-1415 (accepted 01/09/18 12:57:19).pdf
01/09/2018
Progress report
Progress Report, 11-1415 (accepted 06/22/17 06:46:06).pdf
06/22/2017
Progress report
Progress Report, (accepted 02/15/17 18:52:11).pdf
02/15/2017
Progress report
Progress Report 10/08/2015.pdf
10/08/2015
Progress report
Progress Report 12/02/2014.pdf
12/02/2014
Progress report
Progress Report 01/07/2014.pdf
01/07/2014
Progress report
Progress Report 07/29/2013.pdf
07/29/2013
Progress report
Progress Report 06/10/2013.pdf
06/10/2013
Progress report
Progress Report 01/28/2013.pdf
01/28/2013
Salmon Project Proposal
11-1415A Entiat Stormy Final Application 20-39.pdf
06/30/2011
Salmon Project Proposal
11-1415A Entiat Stormy Final Application 1-19.pdf
06/30/2011
SRFB Review Panel Comment Form
Final Comment Form.docx
12/21/2011
SRFB Review Panel Comment Form
Response to SRP Comments 1415 A Entiat Stormy Reach Acquisit.docx
06/23/2011
Stewardship plan
Gray Reach Stewardship Plan Feb 2018.pdf
04/10/2018
Stewardship plan
Cottonwood Area Steward Plan - April 2018.pdf
04/10/2018
Stewardship plan
Property History for Crone 3.21.18.docx.docx
03/21/2018
Stewardship plan
Tyee Crk Confluence Stew Plan 1.9.13.pdf
01/28/2013
Stewardship plan
Tyee Confl Draft Steward Plan 06-2011.pdf
06/30/2011
Survey-Property Boundary
Donaldson and CDLT BLA 10.20.17.pdf
11/01/2017
Survey-Property Boundary
AFN 2430085 Survey for NSD 10-05-15.pdf
06/21/2017
Survey-Property Boundary
Troy & Tyee Certificate of Exempt 08-27-15.pdf
10/05/2016
Title Insurance
Beutler Final Title Policy 10-14-16.pdf
11/17/2016
Video
The Bridge to Nowhere - Low Res 11-2017.mp4
11/17/2017
Visuals
Cottonwood Bridge Damage 04-2017.pptx
06/21/2017
Visuals
East abutment sinking at upstream end 4.17.docx
06/21/2017
Visuals
Bockhoven South Informal Access Visual.pptx
08/28/2014
Back to top
Date of last change: 04/16/2024