PRISM Project #11-1470 (Completed)
Gorst Creek Habitat Enhancement
    Project Details    
Mid-Puget Sound Fish Enh Grp; Gorst Creek Habitat Enhancement (#11-1470)

Attachment #117514, Gorst Pictures 2
Mid-Puget Sound Fish Enh Grp; Gorst Creek Habitat Enhancement (#11-1470) Attachment #117514, Gorst Pictures 2

Mid-Puget Sound Fish Enh Grp; Gorst Creek Habitat Enhancement (#11-1470)

Attachment #117514, Gorst Pictures 2 Mid-Puget Sound Fish Enh Grp; Gorst Creek Habitat Enhancement (#11-1470)

Attachment #117512, Gorst Pictures 1Mid-Puget Sound Fish Enh Grp; Gorst Creek Habitat Enhancement (#11-1470)

Attachment #117517, Gorst Pictures 3Mid-Puget Sound Fish Enh Grp; Gorst Creek Habitat Enhancement (#11-1470)

Attachment #117518, Gorst Pictures 4
Project Status:  Closed Completed since 09/24/2014
 
Project Type:  Restoration
Project Sponsor:  Mid-Puget Sound Fisheries Enhancement Group
Funding Board:  Salmon Recovery Funding Board
              Funding  
Puget Sound Acq. & Restoration: $80,325
Total RCO Grant: $80,325 (85%)
Sponsor Match: $14,175 (15%)
Total Agreement: $94,500 (100%)
              Links
 

    Project Description    
The Gorst Creek project is a restoration project that will have a direct benefit to Steelhead, Chinook and Coho salmon. Due to channelization, road encroachment and fragmentation of the riparian corridor, Gorst has lost a lot of its quality spawning habitat. This grant will finish the project permitting submission, make any necessary edits to designs and construct a project that will restore riparian and in-stream habitat of 1200 linear feet of creek. The project is at lat/long 47.528082/-122.707479 and just downstream of Jarstad Park on W. Belfair Valley Road. Both spawning and rearing habitat will be created, and current spawning habitat will be protected. There is little rearing habitat, but what is present will be protected.
The project will as designed includes bioengineered bank stabilization and LWD installation, riparian plantings to compliment the already existing site conditions, and sloping back banks where possible to initiate re-connection with the already existing floodplain. Root wads will be strategically placed to protect high erosion areas and create fish rearing habitat and places of refuge. Root wads and other LWD will also be used to create much needed stream complexities by producing points of decreased water velocity and creating pools and eddies (see uploaded design document).
This project is on the lead entity 3 Year Work Plan implementation list and has had SRFB review.

    Project Contacts    
         
Project Sponsor: Mid-Puget Sound Fisheries Enhancement Group Lead Entity: West Sound Partners for Ecosystem Recovery
  Project Contact: Danielle DeVoe

(360) 770-6748
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Bridget Kaminski
bridget.kaminski@rco.wa.gov
(360) 472-5546
   

    Project Location    
General Area:   Kitsap County just South of Gorst, Washington
County:   Kitsap
Legislative District:   26
Congressional District 2022:   06
Salmon Recovery Regions:   Puget Sound
Watershed Administrative Unit:   S Sinclair Inlet
HUC8:   Puget Sound (17110019)
WRIA:   Kitsap
Sections:   32
Township:   T24NR01E
Coordinates:   47.52738591
-122.70612685

    Worksites    
Worksite NameScope of WorkActual Restoration Cost
Dalton (#1) Architectural & Engineering (A&E), Channel structure placement (C.4.d.1), Implementation monitoring, Obtain permits, Planting (C.5.c.1), Streambank stabilization (C.4.e.1) $98,002
 Total$98,002
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Dalton (#1)   Property 1 - Dalton Private
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

Instream Habitat Project
      Channel structure placement (C.4.d.1)
Miles of Stream Treated for channel structure placement (C.4.d.3) 0.12
Acres Of Streambed Treated for channel structure placement (C.4.d.4) 0.2
Pools Created through channel structure placement (C.4.d.5) 6
Number of structures placed in channel (C.4.d.7) 35
      Streambank stabilization (C.4.e.1)
Miles of Streambank Stabilized (C.4.e.3) 0.23

Riparian Habitat Project
      Planting (C.5.c.1)
Acres Planted in riparian (C.5.c.3) 0.2

Permits
      Obtain permits
Number of permits required for implementation of project 3

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 12/08/2011
Landowner Agreement to RCO 02/29/2012 Attachment 15.
Progress Report Due 05/31/2012
Applied for Permits 06/15/2012
Annual Project Billing Due 12/07/2012
Permits Complete 12/31/2012
Progress Report Due 12/31/2012
Cultural Resources Complete 03/01/2013 USACOE permit attached in PRISM
Progress Report Due 05/15/2013
Final Design to RCO 06/15/2013 Final Stamped Design needs to be to RCO prior to construction
Bid Awarded/Contractor Hired 06/30/2013
Annual Project Billing Due 07/31/2013
Restoration Started 08/15/2013
Progress Report Due 12/31/2013
Restoration Complete 05/15/2015
RCO Final Inspection 05/31/2015
Special Conditions Met 06/15/2015 As-Builts showing any changes that occured during construction
Agreement End Date 06/15/2015
Final Report Due 07/15/2015
Final Billing Due 07/15/2015


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Agreement - State 11-1470 Agreement.pdf 04/18/2012
Correspondence SKMBT_C45013070908410.pdf 07/11/2013
Cost Estimate Gorst Construction Budget.xlsx 05/11/2011
Design document SKMBT_C45013070908411.pdf 07/11/2013
Design document GorstCreekFinalDesigns.pdf 06/27/2013
Design document Design (JARPA format).pdf 05/10/2011
Design document (as built) Gorst Planting As-Built 2014.pdf 09/18/2014
Design document (as built) Gorst RCO As Built 2014.pdf 08/08/2014
Final project report Final Report 09/24/2014.pdf 09/24/2014
Inspection Photos Gorst Creek.pptx 09/03/2014
Inspection Report Inspection Report, #1451 (Accepted 09/04/18 12:52:06).pdf 09/04/2018
Map Gorst Creek location map.pdf 05/11/2011
Map Gorst Creek vicinity map.pdf 05/10/2011
Permit 2012 NWP 27 Enclosure _6-15-12_.pdf 07/11/2013
Photo Burrito Wraps and Root Wads.jpg 01/27/2014
Photo Hatchery Chinook Using Apex Jam Pool.jpg 01/27/2014
Photo Finishing Apex Jam.jpg 01/27/2014
Photo Project Complete 2.jpg 01/27/2014
Photo Gorst Pictures 4.jpg 05/11/2011
Photo Gorst Pictures 3.jpg 05/11/2011
Photo Gorst Pictures 2.jpg 05/11/2011
Photo Gorst Pictures 1.jpg 05/11/2011
Progress report Progress Report 02/12/2014.pdf 02/12/2014
Progress report Progress Report 10/07/2013.pdf 10/07/2013
Progress report Progress Report 05/10/2013.pdf 05/10/2013
Progress report Progress Report 12/26/2012.pdf 12/26/2012
Progress report Progress Report 07/31/2012.pdf 07/31/2012
Progress report Progress Report 05/22/2012.pdf 05/22/2012
Project Support / Concern Documents Gorst Creek Enhancement Project Monitoring Plan and Inadvert.pdf 06/27/2013
Project Support / Concern Documents Response to Review Panel Comments.2.docx 08/25/2011
Project Support / Concern Documents Project Proposal_Restoration.docx 08/25/2011
Project Support / Concern Documents Response to Review Panel Comments.docx 06/27/2011
Project Support / Concern Documents Tribal Letter of Support.pdf 05/10/2011
SRFB Review Panel Comment Form Final Comment Form.doc 12/21/2011

Back to top Date of last change: 10/04/2023