Powel Shoreline Restoration Implementation
|
    Funding |
  |
|
    Links |
  |
|
|
The Powel Shoreline Restoration Implementation Project will restore over 1544 lineal feet of privately owned shoreline in Port Madison, Bainbridge Island by removing shoreline armoring. The project will result in increases in various habitats on the property, including an overall increase of 163 percent in current intertidal habitat area, almost tripling the amount of salt marsh habitat over time, and enhancing 32,795 square feet of marine riparian habitat. This project addresses lost salt marsh, intertidal habitats, and marine riparian habitat typically associated with armoring and focuses on recreating shallow intertidal habitat important to juvenile salmonids, particularly ESA-listed Chinook, for migration, feeding, refuge and physiological transition. The nearshore environment associated with this property is home to documented juvenile salmon and forage fish, as identified in Westsound Watersheds Council’s 3 Year Salmon Recovery Plan Implementation List. This is a showcase project to other private shoreline landowners to increase awareness of the importance and option of restoring nearshore habitats in Puget Sound. This project is Phase II of a two phased project and implements Phase I, the Powel Shoreline Restoration Design Project, SRFB project #09-1961N, which resulted in a final design approved by the landowner, and other stakeholders (WDFW, Suquamish Tribe, City of BI, USACE). Phase II has not been previously funded by SRFB but builds off of and continues the work done in Phase I.
|
General Area:
|
|
Port Madison on Bainbridge Island, Kitsap County
|
County:
|
|
Kitsap
|
Legislative District:
|
|
23
|
Congressional District 2022:
|
|
06
|
Salmon Recovery Regions:
|
|
Puget Sound
|
Watershed Administrative Unit:
|
|
Bainbridge Island
|
HUC8:
|
|
Puget Sound (17110019)
|
WRIA:
|
|
Kitsap
|
Sections:
|
|
34
|
Township:
|
|
T26NR02E
|
Coordinates:
|
|
47.70083896 -122.53175476
|
|
|
Worksite Name | Scope of Work | Actual Restoration Cost |
Powel Property (#1)
|
Architectural & Engineering (A&E), Cultural resources, Debris removal (C.9.n.1), Fish screens installed (C.1.c.1), Implementation monitoring, Obtain permits, Planting (C.5.c.1), Removal of existing fill material (C.9.g.1), Restoration signs, Restored land maintained (C.11.c.1), Riparian Plant removal / control (C.5.h.1), Shoreline armor removal or modification (C.9.k.1), Utility relocation / reconnection
|
$349,964
|
| Total | $349,964 |
Amounts may not be complete
Worksite Name | | Property Name | Landowner Type |
Powel Property (#1)
|
|
Property 1 - Powel
|
Private
|
| | | Total |
Amounts may not be complete
| Category / Work Type / Metric | Final |
Restoration Metrics (rolled up from Worksite level) |
Fish Screening Project |
Fish screens installed (C.1.c.1) |
|
Number Of Fish Screens Installed (C.1.c.2)
|
1
|
|
The Flow Rate Of Screened Water (C.1.c.3)
|
300.00
|
Riparian Habitat Project |
Planting (C.5.c.1) |
|
Acres Planted in riparian (C.5.c.3)
|
0.9
|
Riparian Plant removal / control (C.5.h.1) |
|
Acres of riparian treated for plant removal/control (C.5.h.3)
|
0.9
|
Estuarine / Nearshore Project |
Removal of existing fill material (C.9.g.1) |
|
Acres of Estuary Treated through fill material removal (C.9.g.2)
|
0.5
|
Shoreline armor removal or modification (C.9.k.1) |
|
Miles of Shoreline Treated for armor modification/removal (C.9.k.2)
|
0.29
|
|
Acres of Shoreline Treated for armor modification/removal (C.9.k.3)
|
0.2
|
Debris removal (C.9.n.1) |
|
Acres Treated for debris removal (C.9.n.2)
|
0.2
|
Site Stewardship Project |
Restored land maintained (C.11.c.1) |
|
Acres of restored land maintained (C.11.c.2)
|
1.9
|
Permits |
Obtain permits |
|
Number of permits required for implementation of project
|
3
|
Milestone Name | Target Date | Description |
Project Start
|
12/08/2011
|
|
Applied for Permits
|
02/10/2012
|
|
Final Design to RCO
|
06/11/2012
|
Must have final design attached in PRISM before construction activities begin (attachment #18)
|
Annual Project Billing Due
|
07/31/2012
|
|
Cultural Resources Complete
|
08/03/2012
|
Cultural Resources Survey Completed 2011. Attach any documents related to cultural resources in PRISM
|
Permits Complete
|
08/03/2012
|
|
Bid Awarded/Contractor Hired
|
08/10/2012
|
|
Landowner Agreement to RCO
|
08/27/2012
|
|
Restoration Started
|
08/27/2012
|
|
Progress Report Due
|
09/30/2012
|
|
Restoration Complete
|
12/01/2012
|
Armor Removal ended 9/19/12 and reveg planting ended 12/31/12
|
Progress Report Due
|
12/15/2012
|
|
Progress Report Due
|
06/30/2013
|
|
Annual Project Billing Due
|
07/31/2013
|
|
Progress Report Due
|
12/15/2013
|
|
Progress Report Due
|
06/30/2014
|
|
Annual Project Billing Due
|
07/31/2014
|
|
Progress Report Due
|
12/15/2014
|
|
Stewardship Plan to RCO
|
03/06/2015
|
In landowner agreement
|
RCO Final Inspection
|
05/30/2015
|
|
Final Report Due
|
05/30/2015
|
|
Agreement End Date
|
06/30/2015
|
|
Final Billing Due
|
09/30/2015
|
|