Project Snapshot
PRISM Project #12-1757 (Completed)
Entiat IMW –Dillwater Project
    Project Details    
Project Status:  Closed Completed since 07/15/2014
 
Project Type:  Monitoring
Project Sponsor:  Chelan County Natural Resources Department
Funding Board:  Recreation and Conservation Office
              Funding  
Pacific States Projects: $5,999
Total RCO Grant: $5,999 (100%)
Total Agreement: $5,999 (100%)
              Links
 

    Project Description    
This project provides funding to monitor an ELJ project in the Upper Entiat. The ELJ project is to construct 5 Engineered Log Jams (ELJ) in the Upper Entiat River (Figures 8, and 10-15). Each ELJ structure will consist of 25-50 conifer trees with and without root wads. The logs range in size from 14-36 inches in diameter and vary in length from 12-60 feet. There will be 2 types of log jams: bank oriented/deflector and mid-channel/bar apex. Each structure is sited in a specific location to achieve maximum biological benefit and is largely based on a detailed USFWS geomorphic analysis (USFWS, unpublished data). ELJ designs are based on a 2010 USFWS survey of natural log jams in the White River (USFWS, 2011). This funding will allow for:

- Quarterly site visits by two staff for photo documentation
- Staff time to reduce survey data and produce drawings
- Staff visits during high glow events to monitor structures and identify downstream impacts
- Site visits with emergency responders (one year post-construction) for evaluation of any changes


    Project Contacts    
         
Project Sponsor: Chelan County Natural Resources Department Lead Entity: Upper Columbia Salmon Recovery Board Lead Entity
  Project Contact: Michael Kaputa
mike.kaputa@co.chelan.wa.us
(509) 670-6935
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Jeannie Abbott
Jeannie.Abbott@gsro.wa.gov
(360) 480-2701
   

    Project Location    
General Area:   Entiat River
County:   Chelan
Legislative District:   12
Congressional District 2022:   08
Salmon Recovery Regions:   Upper Columbia River
Watershed Administrative Unit:   Lower Entiat
WRIA:   Entiat
Coordinates:   47.71739567
-120.34041834

    Worksites    
Worksite NameScope of WorkActual Monitoring Cost
Dillwater (#1) Intensively monitored watershed (E.1.c.15) $5,999
 Total$5,999
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

Monitoring
      Intensively monitored watershed (E.1.c.15)
# acres (to nearest 0.1 acre) Intensively monitored watershed (E.1.c.15.c) 20.0
# miles (to nearest 0.01 mile) Intensively monitored watershed (E.1.c.15.a) 2.60

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 08/01/2012
Progress Report Due 01/31/2013
Progress Report Due 07/30/2013
Agreement End Date 09/30/2013
Final Billing Due 10/31/2013
Final Report 10/31/2013 started 6/16/14


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Agreement - State PSMFC Agreement 8-28-12.pdf 08/30/2012
Billing forms Emails regarding motorpool mileage A-19 Invoice Voucher 1.pdf 10/24/2013
Final project report Final Report 07/15/2014.pdf 07/15/2014

Back to top Date of last change: 10/15/2024