Ala Spit Restoration, Phase 4
|
Island County Public Works; Ala Spit Restoration, Phase 4 (#14-1108)
Attachment #256759, IMG_20160315_085831357 (002)
|
|
|
    Funding |
  |
|
    Links |
  |
|
|
Phase 4 of the Ala Spit restoration project will construct the preferred alternative identified in the feasibility study (12-1260), which evaluated options for the rock groin and final bulkhead section (435') removal to complete the restoration efforts at Ala Spit County Park. Rock groin modification will restore the littoral transport to the Ala Spit drift cell, as well as add to the aesthetic value of the part as a natural place, while protecting nearby private property. A portion of the rock groin will be relocated landward and to the south to provide protection of the bluff toe in the area waterward of the adjacent house. Full removal of the remaining bulkhead to the north of the groin, as well as realignment of the associated parking lot. Beach nourishment will be added to the site to benefit the spit neck stability and improve habitat. Restoration activities will result in nearly full sediment transport processes restoration, immediate gain of upper beach habitat through direct removal of the entire rock groin, and reconnection of the upland with the beach due to the removal of the bulkhead. Restoration will also result in enhanced recreation and improved conditions in terms of risk management, as park users will no longer be required to traverse the large rock groin and vertical bulkhead south of the parking area, and will also not be require to wade through moderate currents at the neck of the spit at times of higher tides.
|
General Area:
|
|
Whidbey Island
|
County:
|
|
Island
|
Legislative District:
|
|
10
|
Congressional District 2022:
|
|
02
|
Salmon Recovery Regions:
|
|
Puget Sound
|
Watershed Administrative Unit:
|
|
Whidbey Island
|
HUC8:
|
|
Puget Sound (17110019)
|
WRIA:
|
|
Island
|
Coordinates:
|
|
48.39232041 -122.58588250
|
|
|
Worksite Name | Scope of Work | Actual Restoration Cost |
Ala Spit County Park (#1)
|
Architectural & Engineering (A&E), Beach nourishment (C.9.l.1), Obtain permits, Regrading of slope (C.9.i.1), Shoreline armor removal or modification (C.9.k.1)
|
$513,946
|
| Total | $513,946 |
Amounts may not be complete
Worksite Name | | Property Name | Landowner Type |
Ala Spit County Park (#1)
|
|
Property 1 - Ala Spit County Park
|
Local Government
|
| | | Total |
Amounts may not be complete
| Category / Work Type / Metric | Final |
Restoration Metrics (rolled up from Worksite level) |
Estuarine / Nearshore Project |
Regrading of slope (C.9.i.1) |
|
Acres of Estuary Treated through slope regrading (C.9.i.2)
|
1.9
|
Shoreline armor removal or modification (C.9.k.1) |
|
Miles of Shoreline Treated for armor modification/removal (C.9.k.2)
|
0.05
|
|
Acres of Shoreline Treated for armor modification/removal (C.9.k.3)
|
1.9
|
Beach nourishment (C.9.l.1) |
|
Cubic Yards Of Beach Substrate Placed (C.9.l.2)
|
2300
|
|
Miles of Shoreline Treated for beach nourishment (C.9.l.3)
|
0.08
|
|
Acres Treated for beach nourishment (C.9.l.4)
|
0.4
|
Permits |
Obtain permits |
|
Number of permits required for implementation of project
|
3
|
Milestone Name | Target Date | Description |
Project Start
|
09/18/2014
|
SRFB funding award date
|
Applied for Permits
|
01/05/2015
|
|
Special Conditions Met
|
02/28/2015
|
Final design deliverables
|
Final Design to RCO
|
02/28/2015
|
|
Progress Report Due
|
03/01/2015
|
|
Permits Complete
|
03/01/2015
|
|
Bid Awarded/Contractor Hired
|
03/01/2015
|
|
Restoration Started
|
03/31/2015
|
|
Annual Project Billing Due
|
07/31/2015
|
|
Progress Report Due
|
09/30/2015
|
|
Restoration Complete
|
10/31/2015
|
|
RCO Final Inspection
|
12/31/2015
|
|
Funding Acknowl Sign Posted
|
12/31/2015
|
|
Final Report Due
|
01/31/2016
|
|
Final Billing Due
|
02/29/2016
|
|
Progress Report Due
|
04/30/2016
|
|
Annual Project Billing Due
|
07/31/2016
|
|
Progress Report Due
|
09/30/2016
|
|
Agreement End Date
|
12/31/2016
|
|