Skip to main content
Save as PDF
Washington State Recreation and Conservation Office
Project Snapshot
PRISM Project #14-1348 (Completed)
Badger Mtn ID Riverstation screens
    Project Details    
Badger Mtn Irrigation District; Badger Mtn ID Riverstation screens (#14-1348)

Attachment #268872, All screens are installed
Badger Mtn Irrigation District; Badger Mtn ID Riverstation screens (#14-1348) Attachment #268872, All screens are installed

Badger Mtn Irrigation District; Badger Mtn ID Riverstation screens (#14-1348)

Attachment #268872, All screens are installed Badger Mtn Irrigation District; Badger Mtn ID Riverstation screens (#14-1348)

Attachment #254488, IMG_0258Badger Mtn Irrigation District; Badger Mtn ID Riverstation screens (#14-1348)

Attachment #254492, IMG_1212Badger Mtn Irrigation District; Badger Mtn ID Riverstation screens (#14-1348)

Attachment #254494, IMG_1208Badger Mtn Irrigation District; Badger Mtn ID Riverstation screens (#14-1348)

Attachment #254495, IMG_1183Badger Mtn Irrigation District; Badger Mtn ID Riverstation screens (#14-1348)

Attachment #254501, IMG_1181Badger Mtn Irrigation District; Badger Mtn ID Riverstation screens (#14-1348)

Attachment #268873, IMG_1987
Project Status:  Closed Completed since 08/05/2016
 
Project Type:  Restoration
Project Sponsor:  Badger Mountain Irrigation District
Funding Board:  Salmon Recovery Funding Board
              Funding  
Salmon Federal Projects: $133,766
Total RCO Grant: $133,766 (76%)
Sponsor Match: $42,544 (24%)
Total Agreement: $176,310 (100%)
              Links
 

    Project Description    
Badger Mountain Irrigation District (BMID) proposes to install six new, belt-driven fish exclusion screens at BMID’s existing water diversion intake from the Yakima River. The screens will replace five 38-year old screens that are nearing the end of their service life and one screen that is now absent. The screens are located on the Yakima River in the proximity of 540 Columbia Park trail, Richland, WA. Species protected by the screens include juvenile steelhead, juvenile summer and fall Chinook, and juvenile Coho.

The new traveling screens will be sized to match the old screens and housed in the existing river station. Removal and installation of the screens will be done by a boom truck lifting the units vertically up and out of each individual chambered pocket within the existing concrete structure. Upgrading the screens will promote more consist running time and more effective debris clearing of the screens, making for a positive barrier between our intake diversions and the juvenile fish species present at this site in the lower Yakima River.

    Project Contacts    
         
Project Sponsor: Badger Mountain Irrigation District Lead Entity: Yakima Basin Fish and Wildlife Recovery Board Lead Entity
  Project Contact: Colby Getchell
bmidmanager@badgermountainirrigation.com
(509) 628-0777
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Elizabeth Butler
elizabeth.butler@rco.wa.gov
(360) 867-8650
   

    Project Location    
General Area:   lower Yakima River
County:   Benton
Legislative District:   08
Congressional District 2022:   04
Salmon Recovery Regions:   Middle Columbia River
Watershed Administrative Unit:   Cold Creek Agricultural Lands
HUC8:   Lower Yakima (17030003)
WRIA:   Lower Yakima
Sections:   23
Township:   T09NR28E
Coordinates:   46.24513480
-119.26936298

    Worksites    
Worksite NameScope of WorkActual Restoration Cost
Badger Mtn Irrigation Dist Fish Screens (#1) Architectural & Engineering (A&E), Fish screens replaced or modified (C.1.d.1), Obtain permits $309,452
 Total$309,452
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Badger Mtn Irrigation Dist Fish Screens (#1)   Property 1 - U.S. Corps of Engineers Federal Government
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

Permits
      Obtain permits
Number of permits required for implementation of project 4

Fish Screening Project
      Fish screens replaced or modified (C.1.d.1)
The Flow Rate Of Screened Water (C.1.d.3) 99.00
Number Of Fish Screens Replaced Or Modified (C.1.d.2) 6

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 12/03/2014
Progress Report Due 06/30/2015
Cultural Resources Complete 07/01/2015 no ground disturbance is planned; if that changes, please notify RCO immediately
Bid Awarded/Contractor Hired 07/31/2015
Applied for Permits 08/15/2015
Landowner Agreement to RCO 10/01/2015 from Army Corps of Engineers, also attach screen operation and maintenance plan to PRISM
Permits Complete 11/01/2015
Restoration Started 11/30/2015
Final Design to RCO 11/30/2015 BMID will submit all engineering and specifications of materials
Progress Report Due 11/30/2015
Funding Acknowl Sign Posted 01/31/2016 RCO has small metal signs available for use upon request
RCO Final Inspection 05/31/2016
Restoration Complete 06/15/2016
Agreement End Date 06/15/2016 PROJECT CLOSING. All expenditures must be prior to this date.
Final Design to RCO 06/15/2016 As-built documentation, if constructed project differs from final design
Final Report Due 07/31/2016
Annual Project Billing Due 07/31/2016
Final Billing Due 08/15/2016


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Agreement - State 14-1348 Project Agreement.pdf 06/02/2015
Agreements - Special WDFW contract amendment.pdf 06/23/2016
Agreements - Special Fish Screen Contract WDFW 2015.pdf 10/09/2015
Amendment - State 14-1348 Amend #1 Time Extension.pdf 03/31/2016
Amendment request Request for Extension 3-2016.pdf 03/29/2016
Application Review Report Application Review Report, 14-1348R(compl 08/28/14 10:15:58).pdf 08/28/2014
Correspondence PARTIAL FUNDING PLAN.docx 11/21/2014
Correspondence HISTORY IRRIGATION RATES.xls 06/19/2014
Cost Estimate cost estimate.xls 08/28/2014
Design document CAD for Fish Screens 122015.pdf 12/22/2015
Design document conceptual design of fish screens.pdf 04/30/2014
Design document (as built) Badger Mnt belt screen SCOTTS-SH 1.pdf 07/07/2016
Design document (as built) Badger Mnt belt screen SCOTTS-SH 2.pdf 07/07/2016
Design document (as built) Badger Mnt belt screen SCOTTS-SH 3.pdf 07/07/2016
Design document (as built) Badger Mnt belt screen SCOTTS-SH 4.pdf 07/07/2016
Design document (as built) Badger Mnt belt screen SCOTTS-SH 5.pdf 07/07/2016
Design document (as built) Badger Mnt belt screen SCOTTS-SH 6.pdf 07/07/2016
Design document (as built) Badger Mnt belt screen SCOTTS-SH 7.pdf 07/07/2016
Design document (as built) Badger Mnt belt screen SCOTTS-SH 8.pdf 07/07/2016
Design document (as built) Badger Mnt belt screen SCOTTS-SH 9.pdf 07/07/2016
Design document (as built) Badger Mnt belt screen SCOTTS-SH 10.pdf 07/07/2016
Easement PP IVE Update letter 20160427.pdf 07/07/2016
Easement Water Intake DIP Letter.pdf 07/07/2016
Easement USDACE Easement.pdf 09/08/2015
Final project report Final Report 08/05/2016.pdf 08/05/2016
Inspection Photos Final Site Visit Photos.pptx 07/01/2016
Inspection Report Inspection Report, #776 (Submitted 07/01/16 17:12:15).pdf 07/01/2016
Map: Restoration Worksite aerial of fish screen.pdf 04/23/2014
Photo row of screens.jpg 07/01/2016
Photo IMG_1993.jpg 06/23/2016
Photo IMG_1987.jpg 06/23/2016
Photo All screens are installed.jpg 06/23/2016
Photo IMG_1181.jpg 03/28/2016
Photo IMG_0259.jpg 03/28/2016
Photo IMG_0266.jpg 03/28/2016
Photo IMG_0262.jpg 03/28/2016
Photo IMG_1182.jpg 03/28/2016
Photo IMG_1183.jpg 03/28/2016
Photo IMG_1208.jpg 03/28/2016
Photo IMG_1213.jpg 03/28/2016
Photo IMG_1212.jpg 03/28/2016
Photo IMG_1217.jpg 03/28/2016
Photo IMG_1218.jpg 03/28/2016
Photo IMG_0258.jpg 03/28/2016
Photo tank top locks 147.jpg 04/23/2014
Photo tank top locks 145.jpg 04/23/2014
Progress report Progress Report 12/30/2015.pdf 12/30/2015
Progress report Progress Report 10/26/2015.pdf 10/26/2015
Progress report Progress Report 07/01/2015.pdf 07/01/2015
Project Application Report Application Report, 14-1348R (submitted 08/15/14 15:59:03).pdf 08/15/2014
Salmon Project Proposal FINAL Project proposal.docx 08/28/2014
Salmon Project Proposal 8-15-15 proposal for screens db edit.doc 08/15/2014
Salmon Project Proposal April DRAFT proposal for screens.doc 04/23/2014
Scope of work SOW Badger Mountain Irrigation District Belt Screens.doc 08/18/2015
SRFB Review Panel Comment Form 14-1348 Review Panel Comments.pdf 12/30/2014
Stewardship plan Fish Screen O&M Plan.pdf 07/14/2016
Visuals BMID Screen Construction & Installation Photos.pptx 03/22/2016
Visuals vicinity map2.pdf 04/30/2014
Visuals vicinity map1.pdf 04/30/2014