Camano CC Tidegate Feasibility & Prelim Design
|
Snohomish Conservation Dist; Camano CC Tidegate Feasibility & Prelim Design (#18-1382)
Attachment #334295, North Lagoon tidegates and Beach Ln culvert to south lagoon_
|
|
|
    Funding |
  |
|
    Links |
  |
|
|
Snohomish Conservation District and Camano County Club will partner to complete the a feasibility study to evaluate the potential for relocating and/or removing the current tide gates in the north lagoon of the Camano Country Club and enhancing tidal exchange in the south lagoon to provide improved access to the F type stream (Camano Country Club Creek) and the north lagoon for juvenile Chinook and other salmonids. The feasibility study will also investigate opportunities to enhance lower Camano Country Club Creek and north lagoon with in-channel and riparian habitat actions and options for removing or replacing a portion of the armoring along the beach adjacent to the north lagoon (approximately 100 - 200 feet of the existing bulkhead). The proposed project includes feasibility analysis and landowner engagement activities and is expected to result in preliminary designs (permit-ready) and landowner willingness (landowner agreement) for restoration actions.
|
County:
|
|
Island
|
Legislative District:
|
|
10
|
Congressional District 2022:
|
|
02
|
Salmon Recovery Regions:
|
|
Puget Sound
|
Watershed Administrative Unit:
|
|
Camano Island
|
HUC8:
|
|
Puget Sound (17110019)
|
WRIA:
|
|
Island
|
Coordinates:
|
|
48.16660643 -122.47537144
|
|
|
Worksite Name | Scope of Work | Actual Planning Cost |
Camano Country Club Lagoons (#1)
|
Conducting habitat restoration scoping and feasibility studies (B.1.b.8), Preliminary design (B.1.b.11.a RCO)
|
$118,070
|
| Total | $118,070 |
Amounts may not be complete
Worksite Name | | Property Name | Landowner Type |
Camano Country Club Lagoons (#1)
|
|
Property 1 - Camano Country Club HOA
|
Private
|
| | | Total |
Amounts may not be complete
| Category / Work Type / Metric | Final |
Restoration Metrics (rolled up from Worksite level) |
|
|
|
Area Encompassed (acres) (B.0.b.1)
|
0.4
|
|
Miles of Stream and/or Shoreline Affected (B.0.b.2)
|
0.25
|
Milestone Name | Target Date | Description |
Cultural Resources Complete
|
11/21/2018
|
Exempt from EO 05-05: No Ground Disturbance. No further cultural resources review is required at this time.
|
Project Start
|
07/01/2019
|
|
Data Gathering Started
|
06/30/2020
|
|
Progress Report Due
|
07/31/2020
|
|
Annual Project Billing Due
|
07/31/2020
|
|
Annual Project Billing Due
|
07/31/2020
|
|
Progress Report Due
|
07/31/2020
|
|
Progress Report Due
|
12/15/2020
|
|
Annual Project Billing Due
|
03/31/2021
|
|
Progress Report Due
|
06/30/2021
|
|
Progress Report Due
|
10/31/2021
|
|
RFP Complete/Consultant Hired
|
08/31/2022
|
|
Progress Report Due
|
10/31/2022
|
|
Progress Report Due
|
03/01/2023
|
|
Other
|
04/10/2023
|
Alternatives Analysis Submitted to RCO
|
Other
|
04/15/2023
|
Present Alternatives to SRTCC
|
Other
|
05/19/2023
|
Select preferred Alternative
|
Special Conditions Met
|
05/22/2023
|
SRFB Review Panel review of alternatives analysis and selection of a preferred alternative. (30 day review)
|
Draft Design to RCO
|
05/31/2023
|
Draft Preliminary Design, per Manual 18 Appendix D-2.
|
Other
|
05/31/2023
|
Present draft preliminary design to SRTCC.
|
Preliminary Design to RCO
|
06/30/2023
|
Final Preliminary Design, per Manual 18 Appendix D-2.
|
Agreement End Date
|
06/30/2023
|
|
Other
|
06/30/2023
|
19-21 PSAR expires 6/2023
|
Final Report Due
|
07/31/2023
|
|
Final Billing Due
|
07/31/2023
|
|