Skip to main content
Save as PDF
Washington State Recreation and Conservation Office
Project Snapshot
PRISM Project #18-1382 (Completed)
Camano CC Tidegate Feasibility & Prelim Design
    Project Details    
Snohomish Conservation Dist; Camano CC Tidegate Feasibility & Prelim Design (#18-1382)

Attachment #334295, North Lagoon tidegates and Beach Ln culvert to south lagoon_
Snohomish Conservation Dist; Camano CC Tidegate Feasibility & Prelim Design (#18-1382) Attachment #334295, North Lagoon tidegates and Beach Ln culvert to south lagoon_

Snohomish Conservation Dist; Camano CC Tidegate Feasibility & Prelim Design (#18-1382)

Attachment #334295, North Lagoon tidegates and Beach Ln culvert to south lagoon_
Project Status:  Closed Completed since 11/07/2023
 
Project Type:  Planning
Project Sponsor:  Snohomish Conservation District
Funding Board:  Salmon Recovery Funding Board
              Funding  
Puget Sound Acq. & Restoration: $80,150
Salmon State Supplemental Sm: $20,150
Total RCO Grant: $100,300 (85%)
Sponsor Match: $17,700 (15%)
Total Agreement: $117,999 (100%)
              Links
 

    Project Description    
Snohomish Conservation District and Camano County Club will partner to complete the a feasibility study to evaluate the potential for relocating and/or removing the current tide gates in the north lagoon of the Camano Country Club and enhancing tidal exchange in the south lagoon to provide improved access to the F type stream (Camano Country Club Creek) and the north lagoon for juvenile Chinook and other salmonids. The feasibility study will also investigate opportunities to enhance lower Camano Country Club Creek and north lagoon with in-channel and riparian habitat actions and options for removing or replacing a portion of the armoring along the beach adjacent to the north lagoon (approximately 100 - 200 feet of the existing bulkhead). The proposed project includes feasibility analysis and landowner engagement activities and is expected to result in preliminary designs (permit-ready) and landowner willingness (landowner agreement) for restoration actions.

    Project Contacts    
         
Project Sponsor: Snohomish Conservation District Lead Entity: Island County Lead Entity
  Project Contact: Kristin Marshall
kristin@snohomishcd.org
(360) 631-9545
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Bridget Kaminski
bridget.kaminski@rco.wa.gov
(360) 472-5546
   

    Project Location    
County:   Island
Legislative District:   10
Congressional District 2022:   02
Salmon Recovery Regions:   Puget Sound
Watershed Administrative Unit:   Camano Island
HUC8:   Puget Sound (17110019)
WRIA:   Island
Coordinates:   48.16660643
-122.47537144

    Worksites    
Worksite NameScope of WorkActual Planning Cost
Camano Country Club Lagoons (#1) Conducting habitat restoration scoping and feasibility studies (B.1.b.8), Preliminary design (B.1.b.11.a RCO) $118,070
 Total$118,070
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Camano Country Club Lagoons (#1)   Property 1 - Camano Country Club HOA Private
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

      
Area Encompassed (acres) (B.0.b.1) 0.4
Miles of Stream and/or Shoreline Affected (B.0.b.2) 0.25

    Project Milestones    
Milestone NameTarget DateDescription
Cultural Resources Complete 11/21/2018 Exempt from EO 05-05: No Ground Disturbance. No further cultural resources review is required at this time.
Project Start 07/01/2019
Data Gathering Started 06/30/2020
Progress Report Due 07/31/2020
Annual Project Billing Due 07/31/2020
Annual Project Billing Due 07/31/2020
Progress Report Due 07/31/2020
Progress Report Due 12/15/2020
Annual Project Billing Due 03/31/2021
Progress Report Due 06/30/2021
Progress Report Due 10/31/2021
RFP Complete/Consultant Hired 08/31/2022
Progress Report Due 10/31/2022
Progress Report Due 03/01/2023
Other 04/10/2023 Alternatives Analysis Submitted to RCO
Other 04/15/2023 Present Alternatives to SRTCC
Other 05/19/2023 Select preferred Alternative
Special Conditions Met 05/22/2023 SRFB Review Panel review of alternatives analysis and selection of a preferred alternative. (30 day review)
Draft Design to RCO 05/31/2023 Draft Preliminary Design, per Manual 18 Appendix D-2.
Other 05/31/2023 Present draft preliminary design to SRTCC.
Preliminary Design to RCO 06/30/2023 Final Preliminary Design, per Manual 18 Appendix D-2.
Agreement End Date 06/30/2023
Other 06/30/2023 19-21 PSAR expires 6/2023
Final Report Due 07/31/2023
Final Billing Due 07/31/2023


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Agreement - State 18-1382 Agreement.pdf 11/13/2019
Amendment - State 18-1382 Amendment #3 - Cost Change.pdf 10/03/2022
Amendment - State 18-1382 Amendment #2 - Time Extension.pdf 08/29/2022
Amendment - State 18-1382 Amend #1 Time Ext .pdf 08/18/2020
Amendment request SAL-AmendRequest_18-1382 CCC Feasibility - amendment 2 reque.docx 08/09/2022
Amendment request combined amendment request document_ SCD 18-1382.docx.docx 07/31/2020
Applicant Resolution/Authorizations SRFB_PSAR Resolution-updated 15Oct2019.pdf 10/22/2019
Applicant Resolution/Authorizations Applicant-Authorization-Resolution_2019Aug06 updated authori.pdf 08/07/2019
Applicant Resolution/Authorizations applicant authorization_SCD_18-1382.pdf.pdf 06/11/2018
Application Review Report Application Review Report, 18-1382P(compl 08/27/18 15:31:31).pdf 08/27/2018
Cost Estimate Special Condition Review Panel Review.pdf.pdf 11/07/2023
Cost Estimate Cost Estimate Alt 3 Special Condition.pdf.pdf 05/15/2023
Cost Estimate Cost Estimate Alt 2 Special Condition.pdf.pdf 05/15/2023
Cost Estimate SRFB_Cost_Estimate_18-1382_final_rev3_post-application revis.xlsx 10/09/2018
Design document CCC Lagoon Restoration Preliminary Design DRAFT.pdf.pdf 11/01/2023
Design document CCC Lagoon Restoration Preliminary Design Plans.pdf.pdf 06/29/2023
Design document CCC Lagoon Preliminary Design BOD June 2023.pdf.pdf 06/29/2023
Design document CCC Alternatives Analysis May 2023.pdf.pdf 05/15/2023
Final project report Final Report, 18-1382 (accepted 11/07/23 08:55:49).pdf 11/07/2023
Map: Multi-site and geographic envelope CamanoCountryClubVicinityMap.pdf.pdf 04/09/2018
Map: Planning Area CamanoCountryClubSiteMap.pdf.pdf 04/09/2018
Photo Tidegates at mouth of north lagoon.JPG.jpg 04/09/2018
Photo North Lagoon tidegates and Beach Ln culvert to south lagoon_.jpg 04/09/2018
Photo Looking north at north lagoon and shoreline armorning .JPG.jpg 04/09/2018
Progress report Progress Report, 18-1382 (accepted 04/07/23 09:00:53).pdf 04/07/2023
Progress report Progress Report, 18-1382 (accepted 08/30/22 11:56:27).pdf 08/30/2022
Progress report Progress Report, 18-1382 (accepted 07/20/21 08:39:15).pdf 07/20/2021
Progress report Progress Report, 18-1382 (accepted 07/31/20 15:24:45).pdf 07/31/2020
Project Application Report Application Report, 18-1382P (submitted 08/09/18 12:45:56).pdf 08/09/2018
Project Deliverables CCC Public Engagement Plan.pdf.pdf 06/29/2023
Project Deliverables ESA contract feas and prelim design_2022-10-19 executed.pdf.pdf 03/30/2023
Project Deliverables CCC Lagoon Restoration Presentation SRTCC 03302023.pdf.pdf 03/30/2023
Salmon Project Proposal C2-Planning Project Proposal_Camano Country Club_revOct2018_.docx 10/09/2018
SRFB Review Panel Comment Form SRFB Review Panel Comment Form.pdf 12/17/2018
Visuals 18-1382 milestone summary.xlsx.xlsx 11/01/2023
Visuals Handout_Final.pdf.pdf 03/30/2023
Visuals CCC Public Engagement Plan DRAFT_KW.docx.docx 03/30/2023
Visuals Cavalero Survey Final2.pdf.pdf 03/30/2023
Visuals CCC Lagoon Restoration Feasibility Study Community Meeting_3.pdf 03/30/2023
Visuals CCC Lagoon Project Flyer.pdf.pdf 03/30/2023

Back to top Date of last change: 12/05/2024