Greenbank Marsh Restoration - Phase 3 Final Design
|
Greenbank Beach and Boat Club; Greenbank Marsh Restoration - Phase 3 Final Design (#19-1344)
Attachment #386292, GBBC lagoon.JPG
|
|
|
    Funding |
  |
|
    Links |
  |
|
|
The project will complete final engineering design and submit permit applications for a project to restore tidal connectivity, fish passage and nearshore ecological functions at the Greenbank Marsh coastal wetland system. The proposed restoration work will follow a preliminary design that was approved by GBBC’s membership, which includes removing an existing stormwater outfall and tidegate and replacing them with an open tidal channel and setback dike. Eventual implementation of the project will not only restore Chinook salmon rearing habitat but also address a long-standing local drainage problem.
|
County:
|
|
Island
|
Legislative District:
|
|
10
|
Congressional District 2022:
|
|
02
|
Salmon Recovery Regions:
|
|
Puget Sound
|
Watershed Administrative Unit:
|
|
Whidbey Island
|
HUC8:
|
|
Puget Sound (17110019)
|
WRIA:
|
|
Island
|
Sections:
|
|
04
|
Township:
|
|
T30NR02E
|
Coordinates:
|
|
48.10941842 -122.56767143
|
|
|
Worksite Name | Scope of Work | Proposed Planning Cost |
Greenbank Marsh (#1)
|
Final design and permitting (B.1.b.11.a RCO)
|
$182,900
|
| Total | $182,900 |
Amounts may not be complete
Worksite Name | | Property Name | Landowner Type |
Greenbank Marsh (#1)
|
|
Property 1 - GBBC Greenbank Marsh property
|
Private
|
| | | Total |
Amounts may not be complete
| Category / Work Type / Metric | Estimated |
Restoration Metrics (rolled up from Worksite level) |
|
|
|
Area Encompassed (acres) (B.0.b.1)
|
21.0
|
|
Miles of Stream and/or Shoreline Affected (B.0.b.2)
|
0.04
|
Permit Type | Applied Date | Received Date | Expiration Date | Permit Number |
Shoreline Permit
|
|
|
|
|
Endangered Species Act Compliance [ESA]
|
|
|
|
|
Clear & Grade Permit
|
|
|
|
|
SEPA
|
|
|
|
|
Dredge/Fill Permit [Section 10/404 or 404]
|
|
|
|
|
Water Quality Certification [Section 401]
|
|
|
|
|
Nationwide Permit
|
|
|
|
|
Hydraulics Project Approval [HPA]
|
|
|
|
|