Twisp River Floodplain Phase III - Riprap Removal
|
|
|     Funding |
  |
|
|
|     Links |
|
|   |
|
|
|
This project builds on work actions completed at the Twisp River Floodplain site to enhance floodplain connectivity within the project area centered at River Mile 4 of the lower Twisp River. MSRF is seeking support from BPA to evaluate restoration opportunities and develop conceptual and preliminary designs for removal of approximately 250 linear feet of rip-rap armor from the left bank of the Twisp River.
|
| Worksite Name | Scope of Work | Proposed Planning Cost |
|
|
|
$0
|
| | Total | $0 |
Amounts may not be complete