Project Snapshot
PRISM Project #23-1938 (Proposed)
North Creek Culvert Replacement Project
    Project Details    
Project Status:  Application Complete since 05/09/2024
 
Project Type:  Restoration
Project Sponsor:  Gig Harbor Public Works
Funding Board:  Recreation and Conservation Office
              Funding  
BA Fish Barrier Removal Board: $4,589,129
Total RCO Grant: $4,589,129 (85%)
Sponsor Match: $823,518 (15%)
Total Agreement: $5,412,647 (100%)
              Links
 

    Project Description    
The project will replace an aging 6-ft x 6-ft x 146-ft (w x h x l) concrete box culvert that conveys the North Creek under Harborview Drive in the City of Gig Harbor, Washington. Harborview Drive appears on maps as early as 1917. The culvert is located along the apparent natural flow path of North Creek. The current box culvert was originally constructed prior to 1970. To improve fish passage at this location, a new crossing is proposed to safely convey the 100-year flood and provide suitable velocity and depth over a range of flows to allow use and passage by juvenile and adult salmonids, including Chinook, coho, steelhead, and chum. The project will remove the culvert and soil fill prism, replacing the crossing with a 45-ft x 85-ft (w x l) bridge deck that will carry two lanes of traffic, pedestrian sidewalks, and utilities, including water, sewer, and electrical. In doing this, the new crossing will provide additional benefit as a wildlife corridor and may include a pedestrian undercrossing under the road along the stream bank to connect Donkey Creek Park, as was also done at the downstream crossing at North Harborview Drive. The bridge will be supported on abutments that are spaced wide enough to accommodate the 100-year flood and the estimated 2080 climate change flood. The proposed bridge project will reconnect 0.51 miles of North Creek stream corridor to the estuary of Gig Harbor

    Project Contacts    
         
Project Sponsor: Gig Harbor Public Works Lead Entity: West Sound Partners for Ecosystem Recovery
  Project Contact: Dean Zavack
dzavack@gigharborwa.gov
(253) 853-7637
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: John Foltz
john.foltz@rco.wa.gov
13608678573
   

    Project Location    
County:   Pierce
Legislative District:   26
Congressional District 2022:   06
Salmon Recovery Regions:   Puget Sound
Watershed Administrative Unit:   Clovos Passage/Carr Inlet
HUC8:   Puget Sound (17110019)
WRIA:   Kitsap
Sections:   06
Township:   T21NR02E
Coordinates:   47.33768991
-122.59490246

    Worksites    
Worksite NameScope of WorkProposed Restoration Cost
Harborview Drive Right of Way, City of Gig Harbor (#1) Architectural & Engineering (A&E), Bridge installed or improved (C.2.g.1) $5,412,647
 Total$5,412,647
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Harborview Drive Right of Way, City of Gig Harbor (#1)   Property 1 - Harborview Drive ROW, City of Gig Harbor Local Government
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricEstimated

Restoration Metrics (rolled up from Worksite level)

Fish Passage Improvement
      Bridge installed or improved (C.2.g.1)
Miles of stream made accessible by bridge installation/repair (C.2.g.3) 0.51
Number of bridges (C.2.g.2) 1
      
Number of blockages / impediments / barriers impeding passage (C.2.b.4) 1

    Project Permits    
Permit TypeApplied
Date
Received
Date
Expiration
Date
Permit Number
Shoreline Permit 04/17/2024 forthcoming
Hydraulics Project Approval [HPA] 04/17/2024 forthcoming
SEPA 04/17/2024 forthcoming
Clear & Grade Permit 04/17/2024 forthcoming
Building Permit 07/17/2024 forthcoming
Endangered Species Act Compliance [ESA] 04/17/2024 forthcoming
US Army Corps of Engineers 04/17/2024 forthcoming
Other Required Permits 04/17/2024 forthcoming

    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Applicant Resolution/Authorizations R-1304 RCO GRANT Authorization_01-22-24.pdf (1).PDF.pdf 03/28/2024
Applicant Resolution/Authorizations R-1304.pdf.pdf 03/28/2024
Application Review Report Grant Manager Comments, 23-1938R(compl 05/09/24 14:58).pdf 05/09/2024
Application Review Report Grant Manager Comments, 23-1938R(rtnd 03/26/24 15:00).pdf 03/26/2024
CCA Tribal Notification Tribal Notification_Squaxin.pdf.pdf 06/06/2024
CCA Tribal Notification Tribal Notification_Puyallup_Tribe_of_Indians.pdf.pdf 06/06/2024
CCA Tribal Notification Tribal Notification_Nisqually.pdf.pdf 06/06/2024
Cost Estimate FBRB-CostEstimateSpreadsheet_5-1-2024.xlsx.xlsx 05/02/2024
Design document North Creek RCO Manual 22 BOD Report_04302024_signed.pdf.pdf 05/01/2024
Design document 1.30_NCrkCulvertRepl-20231127.pdf.pdf 05/01/2024
Map: Restoration Worksite NCrkCulvertRepl-Restoration WorksiteMap.pdf.pdf 01/17/2024
Photo culvert exit.jpg.jpg 01/18/2024
Photo NorthCreek Upstream Habitat.jpg.jpg 01/18/2024
Project Application Report Project Application Report, 23-1938R (sub 05/02/24 09:17:21).pdf 05/02/2024
Project Application Report Project Application Report, 23-1938R (sub 01/18/24 11:05:44).pdf 01/18/2024
WDFW barrier & screening forms 105 K053021a_WDFW_Report.pdf.pdf 01/17/2024

Back to top Date of last change: 10/15/2024