Project Snapshot
PRISM Project #23-1948 (Proposed)
Barnabee Farms Springbrook Creek Rest.
    Project Details    
Bainbridge Island Land Trust; Barnabee Farms Springbrook Creek Rest. (#24-1167)

Attachment #497030, Outlet of Barnabee Culvert.jpg
Bainbridge Island Land Trust; Barnabee Farms Springbrook Creek Rest. (#24-1167) Attachment #497030, Outlet of Barnabee Culvert.jpg

Bainbridge Island Land Trust; Barnabee Farms Springbrook Creek Rest. (#24-1167)

Attachment #497030, Outlet of Barnabee Culvert.jpg Bainbridge Island Land Trust; Barnabee Farms Springbrook Creek Rest. (#24-1167)

Attachment #497026, Barnabee Armored and constrained channel downstream of culve
Project Status:  Application Complete since 05/29/2024
 
Project Type:  Restoration
Project Sponsor:  Bainbridge Island Land Trust
Funding Board:  Recreation and Conservation Office
              Funding  
BA Fish Barrier Removal Board: $217,177
Total RCO Grant: $217,177 (55%)
Sponsor Match: $176,100 (45%)
Total Agreement: $393,277 (100%)
              Links
 

    Project Description    
The Barnabee Farm Springbrook Stream Restoration project will result in a final engineered design, permitting, removal of a 67% fish passage barrier undersized culvert and bridge installation. Springbrook Creek, is a stream federally designated as critical habitat for ESA threated Puget Sound Steelhead.  The Barnabee Farm project takes place on private land at stream mile 0.39 and was identified in the Springbrook Creek Watershed Assessment (SCWA) (Project 14-1547) as the second highest priority stream restoration project to: address fish access to 0.16 miles of upstream fish habitat; widen this section of channel to reflect natural stream conditions; improve connectivity between intact stream reaches adjacent to the existing undersized culvert; allow the stream to withstand anticipated higher flows anticipated in a changing climate; and allow for wood and sediment transport. Using the conceptual design developed by Wild Fish Conservancy (WFC) as part of the SCWA, a final design will be developed in consultation with the landowner, WFC, and other stakeholders working in the watershed, permitting will be completed, a construction bid package will be developed, and construction will be implemented.

    Project Contacts    
         
Project Sponsor: Bainbridge Island Land Trust Lead Entity: West Sound Partners for Ecosystem Recovery
  Project Contact: Gina King
gina@bi-landtrust.org
(206) 842-1216
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: John Foltz
john.foltz@rco.wa.gov
13608678573
   

    Project Location    
General Area:   Springbrook Creek, Kitsap County WA
County:   Kitsap
Legislative District:   23
Congressional District 2022:   06
Salmon Recovery Regions:   Puget Sound
Watershed Administrative Unit:   Bainbridge Island
HUC8:   Puget Sound (17110019)
WRIA:   Kitsap
Sections:   20
Township:   T25NR02E
Coordinates:   47.64163366
-122.56450704

    Worksites    
Worksite NameScope of WorkProposed Restoration Cost
Barnabee Farms Springbrook Creek Restoration (#1) Architectural & Engineering (A&E), Bridge installed or improved (C.2.g.1), Channel structure placement (C.4.d.1), Cultural resources, Fish passage blockages removed or altered (C.2.c.1), Obtain permits, Streambank stabilization (C.4.e.1) $393,277
 Total$393,277
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Barnabee Farms Springbrook Creek Restoration (#1)   Property 1 - Barnabee Farms Private
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricEstimated

Restoration Metrics (rolled up from Worksite level)

Fish Passage Improvement
      Fish passage blockages removed or altered (C.2.c.1)
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2) 1

Instream Habitat Project
      Channel structure placement (C.4.d.1)
Miles of Stream Treated for channel structure placement (C.4.d.3) 0.02
Number of structures placed in channel (C.4.d.7) 12
      Streambank stabilization (C.4.e.1)
Miles of Streambank Stabilized (C.4.e.3) 0.02

Permits
      Obtain permits
Number of permits required for implementation of project 5

Fish Passage Improvement
      Bridge installed or improved (C.2.g.1)
Miles of stream made accessible by bridge installation/repair (C.2.g.3) 0.16
Number of bridges (C.2.g.2) 1
      
Number of blockages / impediments / barriers impeding passage (C.2.b.4) 1

    Project Permits    
Permit TypeApplied
Date
Received
Date
Expiration
Date
Permit Number
Nationwide Permit
Other Required Permits
Water Quality Certification [Section 401]
SEPA
Hydraulics Project Approval [HPA]
Archaeological & Cultural Resources (EO 21-02)

    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Applicant Resolution/Authorizations 2024-02 BILT Resolution Barnabee Application.pdf.pdf 04/30/2024
Application Review Report Grant Manager Comments, 23-1948R(compl 05/29/24 15:59).pdf 05/29/2024
Application Review Report Grant Manager Comments, 23-1948R(rtnd 03/27/24 16:35).pdf 03/27/2024
CCA Tribal Notification Barnabee Project Tribal Notification_2024.pdf.pdf 05/29/2024
Correction Analysis Form BarnabeeFBRB-AppI-CorrectAnalysisForm.4-28-22.pdf.pdf 04/28/2022
Correction Analysis Form BarnabeeFBRB-AppI-CorrectAnalysisForm.AJFINAL.pdf.pdf 01/13/2022
Cost Estimate BAFBRB_Barnabee_CostEstimate 4_30_24_revised.xlsx.xlsx 04/30/2024
Design document Barnabee Farms Springbrook Creek Restoration Project Basis o.pdf 04/30/2024
Map Barnabee Project SCWA Aerial.pdf.pdf 01/12/2022
Map: Restoration Worksite Barnabee Farms Site Plan_BAFBRB.pdf.pdf 04/30/2024
Map: Restoration Worksite Barnabee Project in Kitsap County.pdf.pdf 01/12/2022
Photo Barnabee Armored and constrained channel downstream of culve.jpg 01/13/2022
Photo - downstream outlet Outlet of Barnabee Culvert.jpg.jpg 01/13/2022
Photo - upstream habitat Upstream of Barnabee Culvert Stream Conditions.jpg.jpg 01/13/2022
Project Application Report Project Application Report, 23-1948R (sub 05/02/24 09:22:05).pdf 05/02/2024
Project Application Report Project Application Report, 23-1948R (sub 01/18/24 13:16:56).pdf 01/18/2024
Visuals Barnabee SCWA Priorities.pdf.pdf 01/12/2022
Visuals Barnabee Project Fish Species Distributions.pdf.pdf 01/12/2022
WDFW barrier & screening forms WDFW Screening Form 881002_Report 2-24-22.pdf.pdf 04/28/2022

Back to top Date of last change: 10/15/2024