PRISM Project #24-1117 (Proposed)
Race Lagoon Culvert #1893 - Phase 2
    Project Details    
Project Status:  Application Complete since 07/22/2024
 
Project Type:  Restoration
Project Sponsor:  Island County Public Works
Funding Board:  Salmon Recovery Funding Board
              Funding  
Salmon State Projects: $897,954
Total RCO Grant: $897,954 (85%)
Sponsor Match: $158,463 (15%)
Total Agreement: $1,056,417 (100%)
              Links
 

    Project Description    
This project proposes to implement Phase 2 of the Race Lagoon Culvert No. 1893 replacement. Island County Public Works has been working with the Skagit Fisheries Enhancement Group to replace a fish barrier culvert, culvert 1893, under Race Road near Coupeville. Removal of these fish passage barriers will open up critical rearing habitat for juvenile salmonids including ESA-listed Threatened Chinook, pink, coho, and chum salmon. These two coastal streams drain to Race Lagoon which has been identified as important pocket estuary habitat for outmigrating salmon from the Skagit, Stillaguamish, and Snohomish Rivers. Pocket estuaries and small coastal streams such as these provide important feeding, resting, and and refuge habitat as juvenile salmon transition from freshwater to saltwater habitat.These culverts were identified in the Culvert Prioritization Inventory conducted by SFEG and Island County in 2021 during which time a Chinook smolt was found in the stream above culvert #1893. In addition, SFEG has been working with local landowners who are open to additional wetland and riparian restoration upstream of these culverts. This grant would fund the final design and construction of culvert 1893. We are still working with property owners on for #1984 for future grant project. Fish passage barrier removal is one of the most rapid and cost-effective ways of increasing the amount of accessible habitat for salmon.

    Project Contacts    
         
Project Sponsor: Island County Public Works Lead Entity: Island County Lead Entity
  Project Contact: Matthew Lander
m.lander@islandcountywa.gov
(360) 679-7331
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Bridget Kaminski
bridget.kaminski@rco.wa.gov
(360) 472-5546
   

    Project Location    
County:   Island
Legislative District:   10
Congressional District 2022:   02
Salmon Recovery Regions:   Puget Sound
Watershed Administrative Unit:   Whidbey Island
HUC8:   Puget Sound (17110019)
WRIA:   Island
Sections:   07
Township:   T31NR02E
Coordinates:   48.19048933
-122.60097843

    Worksites    
Worksite NameScope of WorkProposed Restoration Cost
Race Lagoon #1893 (#1) Architectural & Engineering (A&E), Culvert installed or improved (C.2.f.1), Obtain permits $1,056,417
 Total$1,056,417
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Race Lagoon #1893 (#1)   Property 1 - Race Rd Culvert #1893 Local Government
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricEstimated

Restoration Metrics (rolled up from Worksite level)

Fish Passage Improvement
      Culvert installed or improved (C.2.f.1)
Miles of stream made accessible by culvert installation/repair (C.2.f.3) 0.84
Number of culverts (C.2.f.2) 1
      
Number of blockages / impediments / barriers impeding passage (C.2.b.4) 1

    Project Permits    
Permit TypeApplied
Date
Received
Date
Expiration
Date
Permit Number
Endangered Species Act Compliance [ESA]
Nationwide Permit
Hydraulics Project Approval [HPA]
Archaeological & Cultural Resources (EO 21-02) 01/27/2023 08/15/2023 Completed during phase 1

    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Applicant Resolution/Authorizations Applicant Authorization.pdf.pdf 06/24/2024
Application Document Project Application Report - 24-1117.pdf.pdf 02/21/2024
Application Review Report Grant Manager Comments, 24-1117R(compl 07/22/24 08:43).pdf 07/22/2024
Application Review Report Grant Manager Comments, 24-1117R(rtnd 03/27/24 12:11).pdf 03/27/2024
Correction Analysis Form Culvert 1893 Correction Analysis Form.docx.docx 02/12/2024
Cost Estimate Race Lagoon SAL-CostEstimate.2024.06-07.xlsx.xlsx 06/07/2024
Cost Estimate Race Road Culvert Replacements Construction Costs.pdf.pdf 02/12/2024
Cultural Resource Screening Report Project Cultural Resource Screening Report (10/04/24 11:06:1.pdf 10/04/2024
Cultural Resource Screening Report Project Cultural Resource Screening Report (10/03/24 16:03:0.pdf 10/03/2024
Cultural Resource Screening Report Project Cultural Resource Screening Report (10/03/24 15:56:1.pdf 10/03/2024
Cultural Resource Screening Report Project Cultural Resource Screening Report (10/03/24 15:40:5.pdf 10/03/2024
Design document RRCR 1893-1894.R24_03.28.24.pdf.pdf 04/23/2024
Letters of Support race lagoon LOS SRTCC.pdf.pdf 04/10/2024
Map: Area of Potential Effect (APE) Project APE Report (10/04/24 11:06:16).pdf 10/04/2024
Map: Area of Potential Effect (APE) Project APE Report (10/03/24 16:03:04).pdf 10/03/2024
Map: Area of Potential Effect (APE) Project APE Report (10/03/24 15:56:17).pdf 10/03/2024
Map: Area of Potential Effect (APE) Project APE Report (10/03/24 15:40:54).pdf 10/03/2024
Map: Area of Potential Effect (APE) RaceRoad Culverts APE.pdf.pdf 02/12/2024
Map: Restoration Worksite RaceRoad Culverts MAP.pdf.pdf 02/12/2024
Monitoring activity RaceLagoonFishReport11-30-07.pdf.pdf 02/12/2024
Photo 1893 US Inlet.jpg.JPG.jpg 02/12/2024
Photo 1893 Race Lagoon Estuary (2).jpg.JPG.jpg 02/12/2024
Photo 1893 DS Outlet (2).jpg.JPG.jpg 02/12/2024
Preliminary design report Race Lagoon Tribs Crossing Race Road Basis of Design Report .pdf 04/23/2024
Project Application Report Project Application Report, 24-1117R (sub 06/05/24 09:40:53).pdf 06/05/2024
Project Application Report Project Application Report, 24-1117R (05/09/24 12:20:41).pdf 05/09/2024
Project Application Report Project Application Report, 24-1117R (sub 02/23/24 10:44:01).pdf 02/23/2024
Project Application Report Project Application Report, 24-1117R (02/21/24 09:14:40).pdf 02/21/2024
Project Application Report Project Application Report, 24-1117R (sub 02/14/24 15:45:19).pdf 02/14/2024
Project plan document Race Lagoon Tribs Crossing Race Road Basis of Design Report2.pdf 02/13/2024
Project Review Comments Project Review Comments Report, 24-1117R (05/09/24 12:20:41).pdf 05/09/2024
Project Review Comments Project Review Comments Report, 24-1117R (02/21/24 09:14:40).pdf 02/21/2024
Site Plan: Restoration Site Plan RRCR 1893-1894.R24 (Stream Design)_04.10.24.pdf.pdf 04/23/2024
Visuals PrelimDesignRRCR 1893-1894.R24_02.12.24.pdf.pdf 02/13/2024
Visuals Race Lagoon 1963.pdf.pdf 02/12/2024
Visuals Race Lagoon 1942.pdf.pdf 02/12/2024
Visuals Race Lagoon Culverts Climate Change Information Visual.pdf.pdf 02/09/2024
Visuals EJScreen Community Report Race Rd Culverts Blockgroup Cennsu.pdf 02/09/2024
WDFW barrier & screening forms 1893 Survey.pdf.PDF.pdf 02/12/2024